2012_Lessons learned from the SRA preparation
|
18/10/2012 |
255 KB |
|
2019 IGD-TP position letter regarding the call EC NFRP-10
|
8/04/2019 |
120 KB |
|
2019 Waste Management – IGD-TP Poster
|
14/03/2019 |
8 MB |
|
2020 Christophe Davies Goodbye Message
|
17/11/2020 |
173 KB |
|
2020-12-PREDIS-Newsletter-01
|
3/04/2022 |
2 MB |
|
2021-04-PREDIS-Newsletter-02
|
3/04/2022 |
1 MB |
|
2021-08 IAEA Fourth Plenary Meeting of GEOSAF Part III Information Sheet
|
1/09/2021 |
344 KB |
|
2021-08 IGD-TP Symposium How to Get to SixConventionPoint
|
19/08/2021 |
239 KB |
|
2021-08-ANDRA-Innovative_projects_webinar-Announcement
|
2/08/2021 |
418 KB |
|
2021-08-ERDO-The Road to Sharing Webinar Advert
|
19/08/2021 |
553 KB |
|
2021-09 IGD-TP Symposium and Webinar – Draft Agenda
|
9/09/2021 |
909 KB |
|
2021-09-ERDO-The Road to Sharing Webinar Agenda
|
10/09/2021 |
151 KB |
|
2021-09-IAEA-65th General Conf Side event-A generic Roadmap towards implementing a DGR
|
16/09/2021 |
847 KB |
|
2021-10-EURADWASTE22-SaveTheDate
|
21/10/2021 |
19 KB |
|
2021-11-PREDIS-Newsletter-03
|
3/04/2022 |
1 MB |
|
2022-02-NEA-ICGR6-Provisional Agenda
|
11/02/2022 |
1 MB |
|
2022-03 IGD-TP Symposium and Webinar – Draft Agenda
|
3/04/2022 |
657 KB |
|
2022-04 IGD-TP Symposium and Webinar – Draft Agenda
|
12/04/2022 |
657 KB |
|
2022-06 Decay Days 2022 Flyer
|
14/06/2022 |
3 MB |
|
2022-09 ANDRA Webinar on Innovative Projects
|
1/09/2022 |
642 KB |
|
2022-09 IGD-TP Symposium and Webinar – Programme and Abstracts
|
3/09/2022 |
4 MB |
|
3rd Annual Meeting of the Disco Project – Event Flyer
|
10/02/2020 |
499 KB |
|
ACSEPT – Final report
|
16/02/2022 |
1 MB |
|
ANNETTE 2017 List of learning outcomes of ANNETTE WP2 courses
|
20/06/2017 |
3 MB |
|
ANNETTE Bulletin – December 2018
|
18/12/2018 |
1 MB |
|
ANNETTE D1.1 – Survey on E&T and VET in the Nuclear Fields in Europe
|
28/07/2022 |
995 KB |
|
ANNETTE D1.2 – Sustainable Advanced Networking in Nuclear E&T
|
28/07/2022 |
8 MB |
|
ANNETTE D1.3 – Concept of an Advanced Database for Nuclear E&T and VET
|
28/07/2022 |
316 KB |
|
ANNETTE D1.4 – Concept of the ANNETTE Website
|
28/07/2022 |
856 KB |
|
ANNETTE D1.5 – Effective and sustainable communication with national networks
|
28/07/2022 |
802 KB |
|
ANNETTE D1.6 – European certifications for E&T and VET in relevant nuclear domains
|
28/07/2022 |
8 MB |
|
ANNETTE D1.7 – Procedures for the coordinated E&T efforts planned for WP2
|
28/07/2022 |
506 KB |
|
ANNETTE D1.8 – Report on Available Nuclear Facilities for Life Long Learning
|
28/07/2022 |
269 KB |
|
ANNETTE D2.4 – Implementation of the pilot courses
|
28/07/2022 |
4 MB |
|
ANNETTE D3.1 – Report on the criteria for selecting the E&T products
|
28/07/2022 |
1 MB |
|
ANNETTE D3.2 – Summary description of the E&T products
|
28/07/2022 |
391 KB |
|
ANNETTE D4.1 – Application of the ECVET System in the Nuclear Field
|
28/07/2022 |
1 MB |
|
ANNETTE D4.2 – Software support for competency management
|
28/07/2022 |
1 MB |
|
ANNETTE D4.6 – Evaluation of the Exchanges and Recommendation for Future ECVET Implementation
|
28/07/2022 |
296 KB |
|
ANNETTE D5.1 – Specific needs for courses on nuclear safety culture
|
28/07/2022 |
1 MB |
|
ANNETTE D5.3 – Practical Implementation of Courses on Nuclear Safety Culture
|
28/07/2022 |
4 MB |
|
ANNETTE D6.1 – Competence Needs with Respect to Nuclearization of Fusion
|
28/07/2022 |
4 MB |
|
ANNETTE D6.4 – Report on a pilot run of training courses on nuclear awareness for the fusion field
|
28/07/2022 |
6 MB |
|
ANNETTE D6.5 – Report on the participation of fusion professionals in nuclear training activities
|
28/07/2022 |
706 KB |
|
ANNETTE D7.3 – Summary of Special Events and Advanced Networking
|
28/07/2022 |
5 MB |
|
ANNETTE D7.4 – Interactions and Feedbacks for the ANNETTE Project
|
28/07/2022 |
420 KB |
|
ANNETTE Monthly Bulletin – Issue 15, August 2019
|
5/08/2019 |
1 MB |
|
ARGONA – Final Report
|
22/12/2021 |
2 MB |
|
ARGONA – First annual activity summary
|
22/12/2021 |
77 KB |
|
ARGONA Deliverable 22 – Suggested Guidelines for Transparency and Participation in Nuclear Waste Management Programmes
|
22/12/2021 |
460 KB |
|
BEACON 2018 First Annual Project Meeting – Preliminary Agenda
|
23/04/2018 |
215 KB |
|
BEACON D1.1: State-of-the-Art Report
|
19/07/2022 |
2 MB |
|
BEACON D1.3: Final Assessment Report
|
19/07/2022 |
2 MB |
|
BEACON D2.1: Initial workshop materials
|
19/07/2022 |
43 MB |
|
BEACON D2.2: Database of experimental data
|
19/07/2022 |
40 KB |
|
BEACON D2.3: Identification of captured knowledge of bentonite mechanical evolution gained over the duration of the Beacon project
|
19/07/2022 |
9 MB |
|
BEACON D3.1: Description of the constitutive models available at the start of the project
|
19/07/2022 |
13 MB |
|
BEACON D3.3: Description of the constitutive models developed in the project
|
19/07/2022 |
31 MB |
|
BEACON D4.1: Experimental work for the support of model development and validation
|
19/07/2022 |
15 MB |
|
BEACON D4.3: Experimental work on bentonite evolution in the frame of BEACON – final report of WP4
|
19/07/2022 |
22 MB |
|
BEACON D5.1.1: Specifications for Beacon WP5: testing, verification and validation of models step 1- verification cases
|
19/07/2022 |
2 MB |
|
BEACON D5.1.2: Synthesis of results from task 5.1
|
19/07/2022 |
11 MB |
|
BEACON D5.2.1: Specifications for Beacon WP5: testing, verification and validation of models step 2- large scale experiments
|
19/07/2022 |
4 MB |
|
BEACON D5.2.2: Synthesis of the results obtained of test cases from task 5.2
|
19/07/2022 |
24 MB |
|
BEACON D5.5: Specifications for Beacon WP5: testing, verification and validation of models step 3- predictive test cases
|
19/07/2022 |
5 MB |
|
BEACON D5.6: Synthesis of the results obtained of test cases from task 5.3
|
19/07/2022 |
18 MB |
|
BEACON D5.7: Synthesis of the results obtained of test cases from all tasks
|
19/07/2022 |
23 MB |
|
BEACON D6.2: Civil society perspectives with a focus on verification and validation of models, and comparing models with situations close to disposal conditions (task 5.1 and 5.2 of WP5)
|
19/07/2022 |
2 MB |
|
BEACON D7.2: Project presentation. Nature, scope, activities and expected results of the project
|
19/07/2022 |
637 KB |
|
BEACON D7.3: Beacon Plan for the Exploitation and Dissemination of Results
|
19/07/2022 |
688 KB |
|
BEACON D8.1: Beacon Data Management Plan
|
19/07/2022 |
735 KB |
|
BEACON Project: Third Annual Meeting and General Assembly 2020 – Travel Information
|
29/11/2019 |
463 KB |
|
BELBaR D 2.1 Effect of water chemistry, clay chemistry and water/clay interactions on erosion processes
|
26/03/2018 |
1 MB |
|
BELBaR D 3.1 Microscale investigations on colloid mobility
|
26/03/2018 |
1,015 KB |
|
BELBaR D 4.10 Different mechanisms governing the colloidal stability of dispersions of natural bentonite in dilute solutions
|
26/03/2018 |
7 MB |
|
BELBaR D 4.3 Theoretical understanding of the effect of the Ca on clay gel stability
|
26/03/2018 |
738 KB |
|
BELBaR D 5.3 Conceptual and mathematical models within BELBaR
|
26/03/2018 |
1 MB |
|
BELBaR D1.2 State of the Art Report: Treatment of Collids
|
26/03/2018 |
2 MB |
|
BELBaR D2.2 Erosion processes under flowing water conditions
|
26/03/2018 |
3 MB |
|
BELBaR D2.3 Analysis and characterisation of the bentonite gel and colloids obtained in erosion tests
|
26/03/2018 |
746 KB |
|
BELBaR D6.14 Final conference proceedings
|
26/03/2018 |
10 MB |
|
BELBaR Project final report
|
26/03/2018 |
2 MB |
|
BIOCLIM / BIOMOSA Joint Final Seminar – General Discussion
|
16/10/2019 |
123 KB |
|
BIOCLIM Deliverable D1 – Environmental Change Analysis
|
16/10/2019 |
496 KB |
|
BIOCLIM Deliverable D10-12 – Development and Application of a Methodology for Taking Climate-Driven Environmental Change into Account in Performance Assessments
|
16/10/2019 |
3 MB |
|
BIOCLIM Deliverable D2 – Consolidation of Needs of the European Waste Management Agencies and the Regulator of the Consortium
|
16/10/2019 |
2 MB |
|
BIOCLIM Deliverable D3 – Global climatic features over the next million years and recommendation for specific situations to be considered
|
16/10/2019 |
371 KB |
|
BIOCLIM Deliverable D4 and D5 – Global climatic characteristics, including vegetation and seasonal cycles over Europe, for snapshots over the next 200,000 years
|
16/10/2019 |
3 MB |
|
BIOCLIM Deliverable D6a – Regional climatic characteristics for the European sites at specific times: the dynamical downscaling
|
16/10/2019 |
2 MB |
|
BIOCLIM Deliverable D6b – Application of statistical downscaling within the BIOCLIM hierarchical strategy: methods, data requirements and underlying assumptions
|
16/10/2019 |
335 KB |
|
BIOCLIM Deliverable D7 – Continuous climate evolution scenarios over western Europe (1000km scale)
|
16/10/2019 |
2 MB |
|
BIOCLIM Deliverable D8a – Development of the rule-based downscaling methodology for BIOCLIM Workpackage 3
|
16/10/2019 |
2 MB |
|
BIOCLIM Deliverable D8b – Development of the physical/statistical downscaling methodology and application to climate model CLIMBER for BIOCLIM Workpackage 3
|
16/10/2019 |
1 MB |
|
BIOMOSA Project – Final Report
|
11/10/2019 |
672 KB |
|
Calorimetric Non-Destructive Assay of Large Volume and Heterogeneous Radioactive Waste Drums (May 2019)
|
2/08/2019 |
427 KB |
|
CARBOWASTE 2008 An Integrated Approach to Irradiated Graphite
|
20/02/2019 |
475 KB |
|
CARBOWASTE 2008 Treatment and Disposal of Irradiated Graphite and other Carbonaceous Waste
|
20/02/2019 |
159 KB |
|
CARBOWASTE 2009 Analysis of Nitrogen Impurity Impact on 14C Generation in RBMK-1500 Reactor Graphite
|
20/02/2019 |
508 KB |
|
CARBOWASTE 2009 Thermal Behaviour of Chlorine in Nuclear Graphite at a Microscopic Scale
|
20/02/2019 |
830 KB |
|
CARBOWASTE 2010 Characterization of graphite implanted with chlorine ions using combined Raman microspectrometry and transmission electron microscopy
|
20/02/2019 |
611 KB |
|
CARBOWASTE 2010 Mass Spectrometric Determination of Impurities in Reactor Core Graphite for Radioactive Waste Composition Modelling
|
20/02/2019 |
151 KB |
|
CARBOWASTE 2011 On a Reliable Structural Characterization of Polished Carbons in Meteorites by Raman Spectroscopy
|
20/02/2019 |
414 KB |
|
CARBOWASTE 2013 D0.3.12 Final Report
|
20/02/2019 |
1 MB |
|
CARBOWASTE 2013 D6.0.0 Disposal Behaviour of Irradiated Graphite and Carbonaceous Wastes – WP6 Final Report
|
20/02/2019 |
2 MB |
|
CARBOWASTE 2015 Thesis: Migration du deutérium dans le graphite nucléaire
|
20/02/2019 |
40 MB |
|
CARBOWASTE WP1 Deliverables
|
11/10/2019 |
35 MB |
|
CARBOWASTE WP2 Deliverables
|
11/10/2019 |
109 MB |
|
CARBOWASTE WP3 Deliverables
|
11/10/2019 |
105 MB |
|
CARBOWASTE WP4 Deliverables
|
11/10/2019 |
57 MB |
|
CARBOWASTE WP5 Deliverables
|
11/10/2019 |
31 MB |
|
CARBOWASTE WP6 Deliverables
|
11/10/2019 |
42 MB |
|
CAST 2014 D3.1 State of the art of 14C in Zircaloy and Zr alloys
|
23/09/2014 |
4 MB |
|
CAST 2015 D2.1 State of the art review of steel corrosion and C14 release
|
23/02/2015 |
2 MB |
|
CAST 2015 D3.6 Intermediate report on the analysis of samples total C14 content
|
23/06/2015 |
870 KB |
|
CAST 2015 D4.1 State of art review of spent ion exchange resins
|
23/02/2015 |
2 MB |
|
CAST 2015 D5.5 Review of current understanding of inventory and release of C14 from irradiated graphite
|
23/07/2015 |
4 MB |
|
CAST 2015 Newsletter #1
|
23/02/2015 |
3 MB |
|
CAST 2016 D5.3 Reports on graphite categories in the RBMK reactor
|
23/03/2016 |
1 MB |
|
CAST 2016 D5.7 Report on C14 distribution in irradiated graphite from research reactor VVR-S
|
23/07/2016 |
2 MB |
|
CAST 2016 D5.8 Synthesis report on 14C speciation in solution and gas from French graphite waste
|
23/04/2016 |
2 MB |
|
CAST 2016 D6.1 C14 in safety assessments
|
23/01/2016 |
13 MB |
|
CAST 2016 D7.11 Proceedings of Workshop 1, 5-6 October 2016
|
20/12/2017 |
78 MB |
|
CAST 2017 D2.11 Report on C14 release speciation from stainless steel under acidic conditions
|
23/07/2017 |
1 MB |
|
CAST 2017 D2.12 Report on C14 release speciation from stainless steel
|
23/07/2017 |
2 MB |
|
CAST 2017 D2.7 Report on C14 release speciation from carbon steel under alkaline reducing conditions
|
23/07/2017 |
4 MB |
|
CAST 2017 D2.8 Report on C14 release speciation from stainless steel under alkaline reducing conditions
|
23/10/2017 |
3 MB |
|
CAST 2017 D3.9 Quantification of C14 in liquid and gas
|
23/03/2017 |
1 MB |
|
CAST 2017 D5.11 Report on exfoliation processes and on structural and morphological properties
|
23/07/2017 |
8 MB |
|
CAST 2017 D5.12 Final evaluation of leach rates of treated and untreated i-graphites
|
23/09/2017 |
2 MB |
|
CAST 2017 D5.14 Release of C14 from irradiated VVR-S graphite to solution and gas phases
|
23/08/2017 |
1 MB |
|
CAST 2017 D5.15 Final report on 14C leaching from Vandellos graphite
|
23/08/2017 |
1 MB |
|
CAST 2017 D5.17 Report on modelling of 14C inventory in RBMK reactor core
|
23/07/2017 |
4 MB |
|
CAST 2017 D5.18 Report on 13C behaviour under ion irradiation in HOPG model (model graphite)
|
23/09/2017 |
8 MB |
|
CAST 2017 D6.2 Knowledge supporting safety assessments of 14C
|
23/07/2017 |
2 MB |
|
CAST 2017 D7.11 Proceedings of the First Workshop
|
23/03/2017 |
78 MB |
|
CAST 2017 D7.9 All course notes for training course 1
|
23/06/2017 |
18 MB |
|
CAST 2017 Newsletter #2
|
23/05/2017 |
2 MB |
|
CAST 2017 Newsletter #3
|
23/03/2017 |
2 MB |
|
CAST 2018 D7.20 Workshop 2 Report
|
27/09/2018 |
565 KB |
|
CAST 2018 D7.22 Newsletter 5
|
27/09/2018 |
872 KB |
|
CAST 2018 D7.23 Final Overview of CAST
|
27/09/2018 |
1 MB |
|
CAST 2018 D7.24 Summary of Scientific Progress Achieved
|
27/09/2018 |
355 KB |
|
CAST 2018 D7.25 Summary of Scientific Progress Achieved- For Public and Decision-makers
|
27/09/2018 |
341 KB |
|
CAST 2018 WP2 Steels Deliverables
|
27/09/2018 |
37 MB |
|
CAST 2018 WP3 Zircaloy Deliverables
|
27/09/2018 |
36 MB |
|
CAST 2018 WP4 Ion Exchange Resins Deliverables
|
27/09/2018 |
15 MB |
|
CAST 2018 WP5 Graphite Deliverables
|
27/09/2018 |
44 MB |
|
CAST 2018 WP6 Safety Case Relevance Deliverables
|
27/09/2018 |
22 MB |
|
CAST Deliverable D1.1 – General Assembly Meeting 1 Minutes
|
22/08/2019 |
1 MB |
|
CAST Deliverable D1.10 – Advisory Group Review of WP 2 Final Synthesis Report
|
22/08/2019 |
424 KB |
|
CAST Deliverable D1.11 – Advisory Group Review of WP 3 Final Synthesis Report
|
22/08/2019 |
297 KB |
|
CAST Deliverable D1.12 – Advisory Group Review of WP 4 Final Synthesis Report
|
22/08/2019 |
469 KB |
|
CAST Deliverable D1.13 – Advisory Group Review of WP 5 Final Synthesis Report
|
22/08/2019 |
290 KB |
|
CAST Deliverable D1.14 – Advisory Group Review of WP6 Final Synthesis Report
|
22/08/2019 |
198 KB |
|
CAST Deliverable D1.15 – General Assembly meeting and minutes
|
22/08/2019 |
2 MB |
|
CAST Deliverable D1.16 – Advisory Group Review of 2018 GAM and Final Symposium
|
22/08/2019 |
157 KB |
|
CAST Deliverable D1.17 – Advisory Group Review of WP7 CAST Final Overview Report
|
22/08/2019 |
168 KB |
|
CAST Deliverable D1.3 – Advisory Group Review of CAST Objectives and 1st CAST General Assembly Meeting Minutes
|
22/08/2019 |
268 KB |
|
CAST Deliverable D1.4 – General Assembly Meeting 2 Minutes
|
22/08/2019 |
2 MB |
|
CAST Deliverable D1.5 – Advisory Group Review of Year 1 WP Annual Reports and Minutes of Second CAST GAM
|
22/08/2019 |
898 KB |
|
CAST Deliverable D1.6 – Third General Assembly Meeting Minutes
|
22/08/2019 |
925 KB |
|
CAST Deliverable D1.7 – Advisory Group Review of Year 2 WP Annual Reports and Minutes of Third CAST GAM
|
22/08/2019 |
405 KB |
|
CAST Deliverable D1.8 – General Assembly Meeting 4 Minutes
|
22/08/2019 |
783 KB |
|
CAST Deliverable D1.9 – Advisory Group Review of Year 3 WP Annual Reports and Minutes of Fourth CAST GAM
|
22/08/2019 |
1 MB |
|
CAST Deliverable D2.10 – Determination of 14C Content and Release from Steel
|
22/08/2019 |
2 MB |
|
CAST Deliverable D2.13 – WP2 CIEMAT Final Report on C14 release from steels under aerobic conditions
|
22/08/2019 |
2 MB |
|
CAST Deliverable D2.14 – WP2 ENRESA Final Report on C14 release from steels under aerobic conditions
|
22/08/2019 |
668 KB |
|
CAST Deliverable D2.15 – Influence of material choice on the release and speciation of C14
|
22/08/2019 |
644 KB |
|
CAST Deliverable D2.16 – Final report on C-14 release from steels under low pH and acidic conditions
|
22/08/2019 |
1 MB |
|
CAST Deliverable D2.17 – Final Report on Carbon-14 release from steels under aerobic and anaerobic conditions
|
22/08/2019 |
587 KB |
|
CAST Deliverable D2.18 – Final synthesis report on results from WP2
|
22/08/2019 |
512 KB |
|
CAST Deliverable D2.19 – Corrosion of irradiated steel in alkaline conditions: First measurements of the carbon-14 speciation
|
22/08/2019 |
7 MB |
|
CAST Deliverable D2.2 – Annual Progress Report on WP2 – Year 1
|
22/08/2019 |
4 MB |
|
CAST Deliverable D2.3 – Development of a Compound-specific Carbon-14 AMS Technique for the Detection of Carbon-14 Labelled Organic Compounds
|
22/08/2019 |
1 MB |
|
CAST Deliverable D2.4 – Selected analytical procedures at Armines/Subatech
|
22/08/2019 |
214 KB |
|
CAST Deliverable D2.5 – WP2 Annual Progress Report – Year 2
|
22/08/2019 |
5 MB |
|
CAST Deliverable D2.6 – WP2 Annual Progress Report – Year 3, October 2015 – September 2016
|
22/08/2019 |
4 MB |
|
CAST Deliverable D2.9 – Release and speciation of carbon from stainless steel under mildly and highly alkaline, reducing conditions
|
22/08/2019 |
2 MB |
|
CAST Deliverable D3.1 – State of the art of 14C in Zircaloy and Zr alloys – C14 release from zirconium alloy hulls
|
23/08/2019 |
4 MB |
|
CAST Deliverable D3.10 – Annual progress report on corrosion test
|
23/08/2019 |
890 KB |
|
CAST Deliverable D3.11 – 2nd Annual WP3 progress report
|
23/08/2019 |
3 MB |
|
CAST Deliverable D3.12 – Annual Progress Report on corrosion test
|
23/08/2019 |
2 MB |
|
CAST Deliverable D3.13 – 3rd Annual WP3 Progress Report
|
23/08/2019 |
3 MB |
|
CAST Deliverable D3.14 – Final Report from JRC-Karlsruhe: Determination of C14 Content in and Release from Zircaloy cladding
|
23/08/2019 |
3 MB |
|
CAST Deliverable D3.15 – Final report on C14 release and speciation from Zircaloy
|
23/08/2019 |
1 MB |
|
CAST Deliverable D3.16 – Final report on experimental results on long-term corrosion tests and C14 release assessment, irradiated Zircaloy (RATEN-ICN)
|
23/08/2019 |
3 MB |
|
CAST Deliverable D3.17 – Final report on 14C release from zirconium alloy in highly alkaline conditions
|
23/08/2019 |
3 MB |
|
CAST Deliverable D3.18 – Final report on C-14 released from irradiated Zircaloys in NaOH solution: quantification and speciation of C-14
|
23/08/2019 |
2 MB |
|
CAST Deliverable D3.19 – Final Report on Zr alloys corrosion studies at RWMC
|
23/08/2019 |
2 MB |
|
CAST Deliverable D3.2 – Definition of operating conditions and presentation of the leaching experiments
|
23/08/2019 |
860 KB |
|
CAST Deliverable D3.20 – Final report on C-14 behaviour in Zr fuel clad wastes under disposal conditions
|
23/08/2019 |
2 MB |
|
CAST Deliverable D3.3 – Description of the analytical procedure for gaseous and dissolved C-14 species quantification
|
23/08/2019 |
2 MB |
|
CAST Deliverable D3.4 – Progress report on corrosion tests in the hot cell-experimental setup
|
23/08/2019 |
1 MB |
|
CAST Deliverable D3.5 – 1st Annual WP3 Progress Report
|
23/08/2019 |
2 MB |
|
CAST Deliverable D3.6 – Intermediate report on the analysis of Zircaloy samples C-14 content
|
23/08/2019 |
870 KB |
|
CAST Deliverable D3.7 – Definition of the analytical strategy for C-14 measurements
|
23/08/2019 |
1 MB |
|
CAST Deliverable D3.8 – Description of Zircaloy-4 dissolution experiment in a shielded box
|
23/08/2019 |
1 MB |
|
CAST Deliverable D3.9 – Quantification of C-14 in liquid and gas phases
|
23/08/2019 |
1 MB |
|
CAST Deliverable D4.1 – State of the art review on sample choice, analytical techniques and current knowledge of release from spent ion-exchange resins
|
23/08/2019 |
2 MB |
|
CAST Deliverable D4.2 – Annual progress report on WP4 – 2014
|
23/08/2019 |
2 MB |
|
CAST Deliverable D4.3 – 2nd Annual progress report on WP4 – 2015
|
23/08/2019 |
2 MB |
|
CAST Deliverable D4.4 – 3rd Annual progress report on WP4 – 2016
|
23/08/2019 |
2 MB |
|
CAST Deliverable D4.5 – Final report on the estimation of the source term and speciation of C14 in spent ion-exchange resins
|
23/08/2019 |
3 MB |
|
CAST Deliverable D4.6 – Final report on leaching and desorption experiments of C14 from spent ion exchange resins
|
23/08/2019 |
2 MB |
|
CAST Deliverable D4.7 – Final Report on gaseous release of C-14 from BWR and CANDU Spent Ion Exchange Resins
|
23/08/2019 |
661 KB |
|
CAST Deliverable D4.8 – Compilation and comparison of data on C14 from spent ion-exchange resins
|
23/08/2019 |
953 KB |
|
CAST Deliverable D4.9 – Final Synthesis Report of Spent Ion-Exchange Resins C14 Source Term and Leaching
|
23/08/2019 |
714 KB |
|
CAST Final General Assembly – Third announcement and call for papers
|
20/10/2017 |
63 KB |
|
CATCLAY D1.6 – Processes of cation migration in clayrocks
|
5/12/2019 |
8 MB |
|
Cebama 2016 D1.03 WP1 Experimental studies – State of the art literature review (M09 – Feb 2016)
|
20/03/2016 |
11 MB |
|
Cebama 2016 D4.08 1st Annual Project Workshop Proceedings
|
20/11/2016 |
14 MB |
|
Cebama 2016 D4.09 Basis for application to Safety Case and Performance Assessment
|
20/01/2017 |
654 KB |
|
Cebama 2016 Newsletter #1
|
20/02/2016 |
3 MB |
|
Cebama 2016 Newsletter #2
|
20/11/2016 |
2 MB |
|
Cebama 2017 Newsletter #3
|
20/06/2017 |
7 MB |
|
Cebama 2019 Newsletter #4
|
1/08/2019 |
6 MB |
|
Cebama 3rd Annual Workshop Flyer
|
2/02/2018 |
1 MB |
|
Cebama Deliverable 1.01 – Detailed WP1 description of scientific work: compilation of partner descriptions
|
31/07/2019 |
7 MB |
|
Cebama Deliverable 3.01 – Detailed WP3 description of scientific work: compilation of partner descriptions with update of Appendix B
|
31/07/2019 |
11 MB |
|
Cebama Deliverable 4.10 – Minutes from 2nd Annual Workshop
|
1/08/2019 |
3 MB |
|
Cebama Deliverable D1.02 – Agreement and documentation of systems to be studied
|
31/07/2019 |
151 KB |
|
Cebama Deliverable D1.04 – Report on WP1 established experimental boundary conditions, experimental methods
|
31/07/2019 |
1 MB |
|
Cebama Deliverable D1.05 – Report on WP1 selected experimental materials to be used, including both new laboratory and aged in-situ samples
|
31/07/2019 |
859 KB |
|
Cebama Deliverable D2.01 – Detailed WP2 description of scientific work: Compilation of partner descriptions
|
31/07/2019 |
3 MB |
|
Cebama Deliverable D2.02 – Agreement and documentation of systems to be studied
|
31/07/2019 |
464 KB |
|
Cebama Deliverable D2.03 – WP2: State of the Art Report
|
31/07/2019 |
3 MB |
|
Cebama Deliverable D3.02 – Review and definition of modelling approaches: scale of analysis, physico-chemical processes, software, HPC resources
|
1/08/2019 |
1 MB |
|
Cebama Deliverable D3.03 – Consolidated plan for Upscaling Modelling Task
|
1/08/2019 |
236 KB |
|
Cebama Deliverable D3.04 – Description of and results from the modelling of external lab and/or field experiments
|
1/08/2019 |
4 MB |
|
Cebama Deliverable D3.05 – Preliminary results and interpretation of the modelling of WP1 & WP2 experiments
|
1/08/2019 |
5 MB |
|
Cebama Deliverable D4.01 – Generic Poster presenting the Project
|
1/08/2019 |
616 KB |
|
Cebama Deliverable D4.02 – Project webpage
|
1/08/2019 |
159 KB |
|
Cebama Deliverable D4.04 – Planning on interaction with socio-political stakeholders
|
1/08/2019 |
269 KB |
|
Cebama Deliverable D4.05 – Communication Action Plan
|
1/08/2019 |
402 KB |
|
Cebama Deliverable D4.06 – Planned dissemination of final results
|
1/08/2019 |
232 KB |
|
Cebama Deliverable D4.11 – Draft of the 2nd Annual Project Workshop Proceeding
|
1/08/2019 |
29 MB |
|
Cebama Deliverable D5.01 – Report/Documentation of exchange of data between experimental and modelling WPs (with updating)
|
1/08/2019 |
73 KB |
|
Cebama Deliverable D5.02 – Periodic Management and Activity Report (PM18)
|
1/08/2019 |
56 KB |
|
Cementitious Materials Technology Exchange Flyer
|
21/10/2019 |
1 MB |
|
CHANCE Deliverable D2.1 – End-User-Group Questionnaire
|
1/08/2019 |
271 KB |
|
CHANCE Deliverable D2.2 – Synthesis of commonly used methodology for conditioned radioactive waste characterisation
|
1/08/2019 |
1 MB |
|
CHANCE Deliverable D2.3 – R&D requests in the field of conditioned radioactive characterization
|
26/07/2022 |
4 MB |
|
CHANCE Deliverable D3.1 – Applicability of Calorimetry to Real Waste Characterisation
|
1/08/2019 |
7 MB |
|
CHANCE Deliverable D3.2 – Research and innovation on the overall management of radioactive waste other than geological disposal
|
26/07/2022 |
2 MB |
|
CHANCE Deliverable D3.3 – Results of experimental investigation of calorimetry Applicability
|
26/07/2022 |
3 MB |
|
CHANCE Deliverable D3.4 – Exploitation of results and uncertainties analysis
|
26/07/2022 |
10 MB |
|
CHANCE Deliverable D4.1 – Performance of the Muon Tomography Detector System
|
26/07/2022 |
4 MB |
|
CHANCE Deliverable D4.2 – Performance of the CHANCE muon system in the reconstruction of known blocks of material
|
26/07/2022 |
8 MB |
|
CHANCE Deliverable D4.3 – Report on tuned algorithms and their performance
|
26/07/2022 |
4 MB |
|
CHANCE Deliverable D4.5 – Final Report of WP4
|
26/07/2022 |
29 MB |
|
CHANCE Deliverable D5.1 – Report on validation of transitions of rotation/vibration of HCl, specification and development of the equipment
|
26/07/2022 |
344 KB |
|
CHANCE Deliverable D5.2 – Report on experimental validation of the transitions with 36Cl standards and detection limit
|
26/07/2022 |
1 MB |
|
CHANCE Deliverable D5.3 – Outlook on the prospects of using CRDS for HCl-36 outgassing measurement
|
26/07/2022 |
702 KB |
|
CHANCE Deliverable D5.4 – Report on study of the release behaviour of radiocarbon from irradiated graphite waste using CRDS
|
26/07/2022 |
2 MB |
|
CHANCE Deliverable D5.5 – Report on the validation of CRDS for radiocarbon detection performances with liquid scintillation counting techniques
|
26/07/2022 |
1 MB |
|
CHANCE Deliverable D5.6 – Report on study of the release behaviour of radiocarbon from another type of waste
|
26/07/2022 |
567 KB |
|
CHANCE Deliverable D6.1 – CHANCE public website
|
26/07/2022 |
152 KB |
|
CHANCE Deliverable D6.1 – CHANCE public website
|
2/08/2019 |
152 KB |
|
CHANCE Deliverable D6.2 – Communication Action Plan
|
26/07/2022 |
351 KB |
|
CHANCE Deliverable D6.3 – Study of social and ethical aspects of innovative waste management
|
26/07/2022 |
511 KB |
|
CHANCE Deliverable D6.4 – Topical day on waste characterisation
|
2/08/2019 |
13 MB |
|
CHANCE Deliverable D6.5 – Practical training course on instruments and techniques developed within CHANCE
|
26/07/2022 |
283 KB |
|
CHANCE Deliverable D6.6 – Synthesis of CHANCE project
|
26/07/2022 |
738 KB |
|
CHANCE Project Poster: Characterization of conditioned nuclear waste for its safe disposal in Europe
|
2/08/2019 |
1 MB |
|
Clay Conference 2020 Flyer (Updated June 2020)
|
17/07/2019 |
546 KB |
|
CND – D10: European Radiation Survey and Site Execution Manual (EURSSEM)
|
18/01/2022 |
8 MB |
|
CND – D11: Institutional, Legal and Regulatory Aspects; Licensing and Decommissioning Plan; Radiological Protection and Industrial Safety: Final report
|
18/01/2022 |
536 KB |
|
CND – D12: New Considerations Relating to Screening and Scoping within the Environmental Impact Assessment Process. Public Participation and Socio-economic Aspects in Decommissioning of Nuclear Power Plants: Final report
|
18/01/2022 |
381 KB |
|
CND – D14: Dismantling Techniques, Decontamination Techniques, Dissemination of Best Practice, Experience and Know-how: Final report
|
18/01/2022 |
1 MB |
|
CND – D6: Co-ordination Network on Decommissioning of Nuclear Installations: Final report
|
18/01/2022 |
236 KB |
|
CND – D8.1: Analysis of the Factors Influencing the Selection of Strategies for Decommissioning of Nuclear Installations: Final report
|
18/01/2022 |
980 KB |
|
CND – D8.2: Project Management and Planning: Final report
|
18/01/2022 |
947 KB |
|
CND – D9: Material Management and Characterisation Techniques: Final report
|
18/01/2022 |
1 MB |
|
COVRA R&D Programme Launch – Webinar Agenda
|
20/10/2020 |
77 KB |
|
COWAM 2 – Project final report
|
22/12/2021 |
447 KB |
|
COWAM 2 – Roadmap for Local Committee Construction
|
12/01/2022 |
2 MB |
|
COWAM In Practice – Aspects of Governance in the Practical Implementation of the Concept of Reversibility for Deep Geological Disposal
|
12/01/2022 |
2 MB |
|
COWAM In Practice – Belgian case study: local partnerships for the siting of a LILW repository
|
12/01/2022 |
757 KB |
|
COWAM In Practice – Compte-rendu des activités du groupe CIP France “French Prospective Case Study”
|
12/01/2022 |
675 KB |
|
COWAM IN PRACTICE – European level Guidelines for the Inclusive Governance of Radioactive Waste Management
|
12/01/2022 |
399 KB |
|
COWAM In Practice – First annual activity summary
|
12/01/2022 |
60 KB |
|
COWAM In Practice – Local Liaison Committees and National Association of Local Liaison Committees: the French experience
|
12/01/2022 |
673 KB |
|
COWAM In Practice – Long-Term Environmental Surveillance and Health Risk Assessment
|
12/01/2022 |
1 MB |
|
COWAM In Practice – Prospective Case Study: Romania
|
12/01/2022 |
901 KB |
|
COWAM In Practice – Prospective Case Study: Slovenia
|
12/01/2022 |
659 KB |
|
COWAM In Practice – Publishable Periodic Activity Report 2007-2009
|
12/01/2022 |
257 KB |
|
COWAM In Practice – Sustainable Territorial Development Associated with Radioactive Waste Management
|
12/01/2022 |
765 KB |
|
CROCK – Final Workshop Proceedings of the Collaborative Project “Crystalline ROCK Retention Processes”
|
15/12/2021 |
12 MB |
|
CROCK – Project final report
|
15/12/2021 |
2 MB |
|
CROCK D1.2- Characterization of experimental material.
|
15/12/2021 |
1 MB |
|
CROCK D2.1 – Status of radionuclide sorption and transport studies (Update)
|
15/12/2021 |
510 KB |
|
CROCK D3.1 and D3.2 update.
|
15/12/2021 |
156 KB |
|
CROCK D3.1 and D3.2- Real system analysis
|
15/12/2021 |
211 KB |
|
CROCK D4.1 WP4 Month 12 progress
|
14/12/2021 |
126 KB |
|
CROCK D4.1 WP4 month 27 progress report
|
15/12/2021 |
318 KB |
|
CROCK D5.1 WP5 month 12 progress report
|
15/12/2021 |
386 KB |
|
CROCK D5.1 WP5 month 27 progress report
|
15/12/2021 |
3 MB |
|
CROCK D5.2- Results of the benchmark exercise.
|
15/12/2021 |
526 KB |
|
CROCK D5.3- Radionuclide transport modelling by molecular chemistry, surface complexation and reactive transport modelling
|
15/12/2021 |
1 MB |
|
CROCK D7.1- Establishing and regularly updating public web portal and project internal intranet site
|
15/12/2021 |
261 KB |
|
CROCK D7.2- 3rd annual newletter
|
15/12/2021 |
4 MB |
|
CROCK D7.3- Project presentation
|
15/12/2021 |
363 KB |
|
CROCK D7.5 – Brochure for the 1st CROCK workshop May 2012
|
15/12/2021 |
625 KB |
|
CROCK D7.5- Brochure for the last CROCK workshop, May 2013
|
15/12/2021 |
378 KB |
|
CROCK D7.6-2nd annual newsletter
|
15/12/2021 |
2 MB |
|
CROCK D7.8 – Proceedings of the 1st workshop of the CROCK project
|
15/12/2021 |
28 MB |
|
CROCK D7.9 – Report on participation, presentation, and publication of the project at three different international conferences
|
15/12/2021 |
239 KB |
|
CROCK Deliverable 1.1- Provision of new fracture bearing drill core samples obtained, handled, transported and stored under anoxic conditions, including first documentation.
|
15/12/2021 |
651 KB |
|
CROCK Deliverable 2.1- Status of radionuclide sorption and transport studies
|
15/12/2021 |
360 KB |
|
CROCK Deliverable D7.2- Poster presentation of the project
|
15/12/2021 |
305 KB |
|
D-ERICA – An INTEGRATED APPROACH to the assessment and management of environmental risks from ionising radiation
|
24/01/2022 |
2 MB |
|
D2.2-8.2 HE-E annual monitoring report
|
24/04/2018 |
6 MB |
|
DAEF 2022 Abstract Template
|
11/11/2020 |
29 KB |
|
DAEF 2022 Second Announcement
|
11/11/2020 |
196 KB |
|
Deployment Plan 2011-2016
|
18/10/2012 |
2 MB |
|
DISCO 2021 Newsletter #5
|
25/11/2021 |
1,009 KB |
|
DISCO Deliverable D1.1 – Website open
|
5/08/2019 |
341 KB |
|
DISCO Deliverable D1.10 – Proceedings from the 1st General Assembly
|
5/08/2019 |
4 MB |
|
DISCO Deliverable D1.11 – 2nd “Mobility grant” announcement
|
5/08/2019 |
817 KB |
|
DISCO Deliverable D1.12 – Webinar 2
|
4/10/2019 |
108 KB |
|
DISCO Deliverable D1.13 – Minutes from the 2nd General Assembly
|
4/10/2019 |
284 KB |
|
DISCO Deliverable D1.14 – 2019 Newsletter #3
|
4/10/2019 |
471 KB |
|
DISCO Deliverable D1.15 – Proceedings from the 2nd Annual Meeting
|
4/10/2019 |
6 MB |
|
DISCO Deliverable D1.16 – 3rd “Mobility grant” announcement
|
15/01/2020 |
307 KB |
|
DISCO Deliverable D1.17 Webinar 3
|
21/04/2022 |
127 KB |
|
DISCO Deliverable D1.18 – Minutes of the 3rd General Assembly
|
21/04/2022 |
380 KB |
|
DISCO Deliverable D1.2 – Kick-off minutes
|
5/08/2019 |
665 KB |
|
DISCO Deliverable D1.20 – Proceedings of the 3rd Annual Meeting
|
21/04/2022 |
7 MB |
|
DISCO Deliverable D1.26 – Final Scientific Report
|
21/04/2022 |
1 MB |
|
DISCO Deliverable D1.27 – Plan for peer-reviewed publications in scientific journals
|
5/08/2019 |
418 KB |
|
DISCO Deliverable D1.3 – 2017 Newsletter #1
|
23/08/2017 |
613 KB |
|
DISCO Deliverable D1.4 – Plan for Webinars
|
5/08/2019 |
65 KB |
|
DISCO Deliverable D1.5 – LinkedIn Group established
|
5/08/2019 |
320 KB |
|
DISCO Deliverable D1.6 – Plan for Webinars
|
5/08/2019 |
1 MB |
|
DISCO Deliverable D1.7 – Webinar 1
|
5/08/2019 |
293 KB |
|
DISCO Deliverable D1.8 – Minutes from the 1st General Assembly
|
5/08/2019 |
92 KB |
|
DISCO Deliverable D1.9 – 2018 Newsletter #2
|
11/01/2019 |
1 MB |
|
DISCO Deliverable D2.1 – Initial state report: sample characterisation and experimental set-up
|
5/08/2019 |
1 MB |
|
DISCO Deliverable D2.1 – Initial state report: sample characterisation and experimental set-up
|
4/10/2019 |
1 MB |
|
DISCO Deliverable D2.2 – Failed fuel report: Characterisation and secondary alteration products
|
4/10/2019 |
2 MB |
|
DISCO Deliverable D3.1 – Spent fuel experiments: First dissolution results
|
4/10/2019 |
2 MB |
|
DISCO Deliverable D3.2 – Spent nuclear fuel experiments: Dissolution results for modelling input
|
21/04/2022 |
645 KB |
|
DISCO Deliverable D3.3 – Spent nuclear fuel experiments: Final results of dissolution experiments
|
21/04/2022 |
1 MB |
|
DISCO Deliverable D4.1 – Model materials experiments: First dissolution results
|
4/10/2019 |
2 MB |
|
DISCO Deliverable D4.2 – Model materials experiments: Dissolution results for modelling input
|
21/04/2022 |
2 MB |
|
DISCO Deliverable D4.3 – Model materials experiments: Final dissolution results
|
21/04/2022 |
4 MB |
|
DISCO Deliverable D5.1 – Agreement of conditions to consider in the models: discussions between modelling and experimentalists
|
5/08/2019 |
690 KB |
|
DISCO Deliverable D5.2 – Defect chemistry and thermodynamics of Cr-doped UO2 fuels: Model development and applications (Mid-term report)
|
4/10/2019 |
2 MB |
|
DISCO Deliverable D5.3 – Progress on the modeling of the homogeneous U0.73Pu0.27O2 alteration as a simulant of MOX fuel matrices in an underground disposal cell
|
4/10/2019 |
2 MB |
|
DISCO Deliverable D5.4 – EU DisCo Model Description, Uncertainties and Results
|
21/04/2022 |
2 MB |
|
DISCO Deliverable D5.5 – Development of a reactive transport model of spent fuel dissolution under near field environmental conditions.
|
21/04/2022 |
1 MB |
|
DISCO Deliverable D5.6 – Thermodynamic modelling of “inside canister” conditions during UO2 spent fuel dissolution in a failed steel container
|
21/04/2022 |
3 MB |
|
DISCO Deliverable D5.7 – Modeling of UPuO radiolytic dissolution as a simulant of the alteration of MOX fuel matrices in an underground disposal cell
|
21/04/2022 |
7 MB |
|
DOPAS 2013 D1.2 Project Plan
|
23/04/2018 |
1 MB |
|
DOPAS 2013 D1.3 Website and Extranet
|
23/04/2018 |
645 KB |
|
DOPAS 2013 D3.10 FSS Drift Model Construction Report
|
23/04/2018 |
4 MB |
|
DOPAS 2013 D3.16 EPSP Laboratory Experiment Testing Plan
|
23/04/2018 |
1 MB |
|
DOPAS 2013 D7.1 Project Dissemination Plan
|
23/04/2018 |
1 MB |
|
DOPAS 2013 D7.5 Project Description for the EC FP7 Project Compendium
|
23/04/2018 |
4 MB |
|
DOPAS 2013 Newsletter 1
|
23/04/2018 |
3 MB |
|
DOPAS 2014 D2.1 Design Bases and Criteria
|
23/04/2018 |
5 MB |
|
DOPAS 2014 D2.2 Designs of Reference Concepts and DOPAS Experiments: DOPAS Reference Designs Report
|
23/04/2018 |
2 MB |
|
DOPAS 2014 D3.11 Report on FSS Cast Concrete Plug Construction
|
23/04/2018 |
1 MB |
|
DOPAS 2014 D3.17 Interim Results of EPSP Laboratory Testing
|
23/04/2018 |
2 MB |
|
DOPAS 2014 D3.26 URCF RSC Work Memorandum (POPLU)
|
23/04/2018 |
3 MB |
|
DOPAS 2014 D3.8 Test Report on FSS Cast in Box Concrete
|
23/04/2018 |
1 MB |
|
DOPAS 2014 D5.11 Status report on ELSA/LASA related laboratory tests (D3.28) and on process modelling activities (D5.5)
|
23/04/2018 |
5 MB |
|
DOPAS 2014 D6.1.1 Pilot EE consensus memorandum for D3.25 POPLU test plan
|
23/04/2018 |
1 MB |
|
DOPAS 2014 D7.10 Experiment poster of EPSP at URC Josef Gallery (Czech Republic))
|
23/04/2018 |
977 KB |
|
DOPAS 2014 D7.11.1 Dissemination Activities – Press Releases 0-18M
|
23/04/2018 |
2 MB |
|
DOPAS 2014 D7.11.3 Dissemination activities, papers, presentations and posters (0-18 M)
|
23/04/2018 |
13 MB |
|
DOPAS 2014 D7.11.4 Dissemination Activities – Other 0-18M
|
23/04/2018 |
1 MB |
|
DOPAS 2014 D7.4.2 Newsletter 2
|
23/04/2018 |
4 MB |
|
DOPAS 2014 D7.4.3 Newsletter 3
|
23/04/2018 |
5 MB |
|
DOPAS 2014 D7.7 Experiment poster of DOMPLU at Äspö (Sweden)
|
23/04/2018 |
7 MB |
|
DOPAS 2014 D7.8 Experiment poster of POPLU at ONKALO (Finland)
|
23/04/2018 |
5 MB |
|
DOPAS 2014 D7.9 Experiment poster of FSS at Saint Dizier (France)
|
23/04/2018 |
4 MB |
|
DOPAS 2015 D3.22 DOMPLU experiment
|
23/04/2018 |
3 MB |
|
DOPAS 2015 D4.2 Bentonite Saturation Test (REM)
|
23/04/2018 |
13 MB |
|
DOPAS 2015 D4.3 DOMPLU Experiment Summary Report
|
23/04/2018 |
15 MB |
|
DOPAS 2015 D5.1 Modelling plan for Experiment 2 EPSP PA
|
23/04/2018 |
4 MB |
|
DOPAS 2015 D6.2 Expert staff visit travel reports – Report no 1 – FSS experiment in France
|
23/04/2018 |
2 MB |
|
DOPAS 2015 D6.2.1 Expert staff visit travel reports – Report no 2 – EPSP experiment in Czech Republic
|
23/04/2018 |
572 KB |
|
DOPAS 2015 D6.3 EE documentation from Expert Group EE meeting inputs and outcomes concerning Work Package 2
|
23/04/2018 |
2 MB |
|
DOPAS 2015 D7.4.4 Newsletter 4
|
23/04/2018 |
2 MB |
|
DOPAS 2016 D2.4 WP2 Final Report – Design Basis for DOPAS Plugs and Seals
|
23/04/2018 |
4 MB |
|
DOPAS 2016 D3.1 WP3 FSS Construction Summary Report
|
23/04/2018 |
1 MB |
|
DOPAS 2016 D3.13 Report on FSS shotcrete plug construction
|
23/04/2018 |
782 KB |
|
DOPAS 2016 D3.14 EPSP Experiment (demonstration)
|
23/04/2018 |
2 MB |
|
DOPAS 2016 D3.20 EPSP plug test installation report
|
23/04/2018 |
10 MB |
|
DOPAS 2016 D3.21 Final Results of EPSP Laboratory Testing
|
23/04/2018 |
4 MB |
|
DOPAS 2016 D3.23 POPLU Experiment
|
23/04/2018 |
585 KB |
|
DOPAS 2016 D3.29 Final technical report on ELSA related testing on chemical-hydraulical behaviour – LAVA
|
23/04/2018 |
2 MB |
|
DOPAS 2016 D3.30 WP3 Final Summary Report – Summary of, and Lessons Learned from, Design and Construction of the DOPAS Experiments
|
23/04/2018 |
9 MB |
|
DOPAS 2016 D3.31 Final technical report on ELSA related testing on mechanical-hydraulical behaviour – LASA
|
23/04/2018 |
6 MB |
|
DOPAS 2016 D3.32 Final report on the sealing behaviour of fractured claystone and seal materials (THM-Ton)
|
23/04/2018 |
5 MB |
|
DOPAS 2016 D3.7 Test report on FSS metric clayish material emplacement tests with clayish material definition and laboratory work on its performance
|
23/04/2018 |
3 MB |
|
DOPAS 2016 D4.1 FSS Experiment – Report on Qualification of Commissioning Methods
|
23/04/2018 |
2 MB |
|
DOPAS 2016 D4.4 WP4 Integrated Report: Summary of Progress on, and Performance Evaluation of, Design, Construction and Monitoring of Plugs and Seals
|
23/04/2018 |
6 MB |
|
DOPAS 2016 D4.5 POPLU Experimental Summary Report
|
23/04/2018 |
30 MB |
|
DOPAS 2016 D4.6 Monitoring data from the EPSP plug test summary report
|
23/04/2018 |
9 MB |
|
DOPAS 2016 D4.7 EPSP summary report
|
23/04/2018 |
7 MB |
|
DOPAS 2016 D4.8 FSS experiment summary report
|
23/04/2018 |
2 MB |
|
DOPAS 2016 D4.9 Lessons Learnt for Other Programmes, from the DOPAS Project
|
23/04/2018 |
1 MB |
|
DOPAS 2016 D5.10 WP5 final integrated report
|
23/04/2018 |
10 MB |
|
DOPAS 2016 D5.12 Assessment of watertightness and mechanical integrity of POPLU plug
|
23/04/2018 |
3 MB |
|
DOPAS 2016 D5.7 Models and modelling summary report for EPSP
|
23/04/2018 |
2 MB |
|
DOPAS 2016 D5.8 Final report on conceptual and integrated modelling activities
|
23/04/2018 |
2 MB |
|
DOPAS 2016 D5.9 Integration of demonstrator activities in performance assessment: analysis of processes and indicators
|
23/04/2018 |
7 MB |
|
DOPAS 2016 D6.1 Plan for Integrating Analysis by experts and selection of experts (Expert Elicitation)
|
23/04/2018 |
222 KB |
|
DOPAS 2016 D6.2.2 POPLU Staff Exchange Visit
|
23/04/2018 |
3 MB |
|
DOPAS 2016 D6.3.1 Consensus memorandum for D3.30 Expert Elicitation
|
23/04/2018 |
2 MB |
|
DOPAS 2016 D6.3.2 Consensus memorandum for D4.4 Expert Elicitation
|
23/04/2018 |
3 MB |
|
DOPAS 2016 D6.3.3 Consensus memorandum for D5.10 Expert Elicitation
|
23/04/2018 |
3 MB |
|
DOPAS 2016 D6.4 DOPAS Project Final Summary Report
|
23/04/2018 |
3 MB |
|
DOPAS 2016 D7.2 DOPAS Training Workshop 2015
|
23/04/2018 |
10 MB |
|
DOPAS 2016 D7.3 DOPAS 2016 Proceedings
|
23/04/2018 |
20 MB |
|
DOPAS 2016 D7.4.5 Newsletter 5
|
23/04/2018 |
2 MB |
|
DOPAS 2016 Newsletter 6
|
23/04/2018 |
4 MB |
|
EC CARD Project: Final Report
|
21/12/2021 |
5 MB |
|
EF – WG1-3 JA15 Knowledge Management
|
19/12/2012 |
130 KB |
|
EF1_Daniel A Galson, Galson Sciences Ltd
|
23/08/2012 |
95 KB |
|
EF1_Fco Javier Elorza, Universidad Politécnica de Madrid
|
23/08/2012 |
449 KB |
|
EF1_Gunnar Buckau, JRC/ITU
|
23/08/2012 |
125 KB |
|
EF1_Information on the IGD-TP Exchange Forum meeting (no 1)
|
23/08/2012 |
73 KB |
|
EF1_Jan Haverkamp, Greenpeace
|
23/08/2012 |
964 KB |
|
EF1_Jordi Bruno, Amphos 21
|
23/08/2012 |
220 KB |
|
EF1_Key topics and cross-cutting activities of the SRA
|
23/08/2012 |
178 KB |
|
EF1_Klaus-Jürgen Röhlig, TU Clausthal
|
23/08/2012 |
145 KB |
|
EF1_Prioritisation of RD&D topics: the SRA approach
|
23/08/2012 |
743 KB |
|
EF1_Rosa Lo Frano, CIRTEN
|
23/08/2012 |
1 MB |
|
EF1_Short presentations
|
23/08/2012 |
53 KB |
|
EF1_Support for regulatory functions in the area of geological disposal
|
23/08/2012 |
247 KB |
|
EF1_Tillmann Rothfuchs, GRS
|
23/08/2012 |
214 KB |
|
EF1_Webster_An EU view of IGDTP activities
|
8/08/2012 |
224 KB |
|
EF2_EC news and expectations
|
23/08/2012 |
734 KB |
|
EF2_Eng_Secretariat beyond 2011; Use of website and intranet
|
23/08/2012 |
540 KB |
|
EF2_Huttunen_Ensuring Future Nuclear Competence in Finland
|
23/08/2012 |
263 KB |
|
EF2_Landais_Opening: IGD-TP’s progress
|
23/08/2012 |
542 KB |
|
EF2_Ouzounian_Recap of the IGD-TP’s SRA and the Process of Deployment
|
23/08/2012 |
680 KB |
|
EF2_Palmu_Education and Training – CMET
|
23/08/2012 |
206 KB |
|
EF2_Palmu_Instructions for the afternoon Work groups
|
23/08/2012 |
174 KB |
|
EF2_Plans for other EG Working groups: Interfaces Working Group – IWG
|
23/08/2012 |
587 KB |
|
EF2_Smart_Improved data and understanding of the release of C-14 from various long-lived ILW
|
23/08/2012 |
160 KB |
|
EF2_WG1_Vira_Safety case peer reviews
|
23/08/2012 |
328 KB |
|
EF2_WG2_Landais_Monitoring the environmental reference state
|
23/08/2012 |
89 KB |
|
EF2_WG4_Lalieux_Interfaces WG (IWG)
|
23/08/2012 |
126 KB |
|
EF2_WG5_Setting-up Information Exchange Platform(s)
|
23/08/2012 |
216 KB |
|
EF2_WG6_Brewitz_Safety Case Benchmarking
|
23/08/2012 |
748 KB |
|
EF3 – OP1 – Welcome presentation
|
19/12/2012 |
161 KB |
|
EF3 – OP2 – Opening and Objectives
|
19/12/2012 |
649 KB |
|
EF3 – OP3 EC FP7 programme status – Horizon 2020
|
19/12/2012 |
810 KB |
|
EF3 – OP4 – Sitex presentation
|
28/09/2017 |
414 KB |
|
EF3 – PL1-1 First Nuclide Preparation
|
19/12/2012 |
582 KB |
|
EF3 – PL1-2 JA2 DOPAS
|
19/12/2012 |
640 KB |
|
EF3 – PL1-3 JA3 C14
|
19/12/2012 |
156 KB |
|
EF3 – PL1-4 BELBar preparation
|
19/12/2012 |
906 KB |
|
EF3 – PL1-5 SecIGD2 project
|
19/12/2012 |
1,022 KB |
|
EF3 – PL1-6 JA and MDP
|
19/12/2012 |
784 KB |
|
EF3 – PL2-1 Working Group 1 summary
|
19/12/2012 |
48 KB |
|
EF3 – PL2-2 Working Group 2 summary
|
19/12/2012 |
43 KB |
|
EF3 – WG1-1 Presentation WG environnement
|
19/12/2012 |
115 KB |
|
EF3 – WG1-2 DGR optimization
|
19/12/2012 |
573 KB |
|
EF3 – WG1-4 JA15 CMET
|
19/12/2012 |
149 KB |
|
EF3 – WG1-5 TSWG on cement
|
19/12/2012 |
418 KB |
|
EF3 – WG2-1 Stakeholders involvement
|
19/12/2012 |
2 MB |
|
EF3 – WG2-2 INSOTEC analysis
|
19/12/2012 |
128 KB |
|
EF3 Agenda
|
19/12/2012 |
188 KB |
|
EF3 invitation
|
19/12/2012 |
427 KB |
|
EF3 Joint activities leaders
|
19/12/2012 |
161 KB |
|
EF3 Participants list
|
19/12/2012 |
87 KB |
|
EF3 Registration Form
|
18/10/2012 |
166 KB |
|
EF3 Registration Form_Societal Aspects WS
|
31/10/2012 |
142 KB |
|
EF4 – list of participants
|
6/11/2013 |
89 KB |
|
EF4 Announcement
|
1/07/2013 |
185 KB |
|
EF4 Book of Abstracts
|
22/10/2013 |
264 KB |
|
EF4 P1 – EF4 Objectives, P. Lalieux
|
31/10/2013 |
281 KB |
|
EF4 P1 – InSOTEC, M. Martell
|
31/10/2013 |
157 KB |
|
EF4 P1 – NEWLANCER, D. Diaconu
|
31/10/2013 |
509 KB |
|
EF4 P1 – R&D CzR, J. Slovak
|
31/10/2013 |
2 MB |
|
EF4 P1 – SNETP-Nugenia, F. Pazdera
|
6/10/2013 |
2 MB |
|
EF4 P2 – How to improve EF? J. Delay
|
31/10/2013 |
231 KB |
|
EF4 P2 – IGD-TP Knowledge Management portal, J. Palmu
|
31/10/2013 |
3 MB |
|
EF4 P2 – SecIGD2 WG on RD Dissemination R. Kowe
|
6/11/2013 |
444 KB |
|
EF4 P2 PLATENSO Anderson
|
31/10/2013 |
135 KB |
|
EF4 P2 SAFEROCK G. Buckau
|
31/10/2013 |
140 KB |
|
EF4 P3 – Report on WG1
|
31/10/2013 |
252 KB |
|
EF4 P3 – Report on WG2
|
31/10/2013 |
99 KB |
|
EF4 P3 – Report on WG3
|
31/10/2013 |
84 KB |
|
EF4 P3 – Report on WG4
|
31/10/2013 |
141 KB |
|
EF4 P3 – Report on WG5
|
31/10/2013 |
692 KB |
|
EF4 P3- Conclusion of EF4
|
31/10/2013 |
321 KB |
|
EF4 PL1 – European Commission news & expectations in disposal RD&D programmes
|
6/11/2013 |
1 MB |
|
EF4 Proceedings – presentations and outcomes
|
18/12/2013 |
6 MB |
|
EF4 WG1 – Cementitious materials/components for HLW/ILW repository, French context, X. Bourbon
|
31/10/2013 |
410 KB |
|
EF4 WG1 – How do we treat cement in performance assessment? F. Neall
|
31/10/2013 |
878 KB |
|
EF4 WG1 – Immobilisation of Radionuclides by a Cementitious Backfill, D. Read
|
31/10/2013 |
2 MB |
|
EF4 WG1 – Introduction, L. Johnson
|
31/10/2013 |
678 KB |
|
EF4 WG1 – Modelling systems driven by the presence of cement, L. Duro
|
31/10/2013 |
2 MB |
|
EF4 WG1 – Radionuclide Retention and Redox (Cebama), M. Altmaier
|
31/10/2013 |
492 KB |
|
EF4 WG1 – Results and future plan of RWMC’s R&D, H. Owada
|
31/10/2013 |
3 MB |
|
EF4 WG1 – Status of the proposed CEBAMA project, B. Kienzler
|
31/10/2013 |
189 KB |
|
EF4 WG2 – Aitemin presentation, Garcia-Sineriz
|
31/10/2013 |
2 MB |
|
EF4 WG2 – Belgian R&D monitoring programme, J. Verstricht
|
31/10/2013 |
300 KB |
|
EF4 WG2 – MoDeRn Project: Lessons Learned and Further Work Requirements, M. White
|
31/10/2013 |
432 KB |
|
EF4 WG2 – Recent experience with the use of DIC and AE to monitor surface cracking in a cylindrical concrete buffer, L. Areias
|
31/10/2013 |
3 MB |
|
EF4 WG2 – Results of the “call for ideas” on repository monitoring, JL. Fuentes-Cantillana
|
31/10/2013 |
97 KB |
|
EF4 WG2 – The role of social science in further research on monitoring for GD, A. Bergmans
|
31/10/2013 |
38 KB |
|
EF4 WG2 – wireless transmission system / estimation and judgment for the triggered value in EBS against the reference design value, K. Suzuki
|
31/10/2013 |
1 MB |
|
EF4 WG3 – CARBOSOLUTIONS, G. Laurent
|
31/10/2013 |
773 KB |
|
EF4 WG3 – Implementing Irradiated-Graphite Waste Management, G. von Lensa
|
31/10/2013 |
6 MB |
|
EF4 WG3 – Importance of the waste form from a safety assessment perspective: The SR-Site experience, L Z Evins
|
31/10/2013 |
498 KB |
|
EF4 WG3 – Introduction, D. Warin
|
31/10/2013 |
47 KB |
|
EF4 WG3 – Long-term Behavior of Waste Forms from Gen IV Reactors, G. de Angelis
|
31/10/2013 |
2 MB |
|
EF4 WG3 – Materials for Innovative Disposition by Advanced Separation: MIDAS, N Hyatt
|
31/10/2013 |
1 MB |
|
EF4 WG3 – RED-IMPACT, W. von Lensa
|
31/10/2013 |
2 MB |
|
EF4 WG3 – Results of R&D on future fuel cycle and associated HL waste disposal: the French case, D. Warin
|
31/10/2013 |
2 MB |
|
EF4 WG4 – Andra input for WG4, P. Lebon
|
31/10/2013 |
41 KB |
|
EF4 WG4 – Development of an R&D Programme in Bel V in the field of radioactive waste disposal, V. Detilleux
|
31/10/2013 |
142 KB |
|
EF4 WG4 – Impact of permafrost on repository safety, T. Wildenborg
|
31/10/2013 |
559 KB |
|
EF4 WG4 – Overview of the IGD-TP Strategic Research Agenda (SRA), J. Martin
|
31/10/2013 |
1 MB |
|
EF4 WG4 – Possible interactions between IGD-TP and an expertise network of European NSAs and TSOs
|
31/10/2013 |
134 KB |
|
EF4 WG4 – Round table WMOs
|
31/10/2013 |
225 KB |
|
EF4 WG4 – SITEX view on development of TSO´s RD&D programme, V. Havlová
|
6/11/2013 |
590 KB |
|
EF4 WG5 – Gas generation & removal Radionuclide migration & retention, N. Leys
|
31/10/2013 |
3 MB |
|
EF4 WG5 – Microbial influence on the immobilization of radionuclides in crystalline rock environments, E. Krawczyk-Bärsch
|
31/10/2013 |
1 MB |
|
EF4 WG5 – Microbial influences on radionuclide behavior – an example of less-understood problems and how to solve them, H. Moll
|
31/10/2013 |
1 MB |
|
EF4 WG5 – Modelling microbiology, gas reaction and chemical evolution of geological disposal facilities, J. Small
|
31/10/2013 |
490 KB |
|
EF4 WG5 – Restriction of microbial growth and activity, K. Wouters
|
31/10/2013 |
1 MB |
|
EF4 WG5 – Studying microbial processes under repository relevant conditions, R. Bernier-Latmani
|
31/10/2013 |
2 MB |
|
EF4 WG5 – Understanding presence, diversity and activity of microorganisms in swelling clays intended for use in geological disposal of radioactive wastes, K Pedersen
|
31/10/2013 |
861 KB |
|
EF4_4th Exchange Forum Agenda
|
22/10/2013 |
269 KB |
|
EF4_4th Exchange Forum announcement
|
1/10/2013 |
185 KB |
|
EF4-P2 – IGD‐TP working group on RDD dissemination, R. Kowe
|
6/11/2013 |
444 KB |
|
EF4-WG5 – The impact of microbial metabolism on the geodisposal of radwaste in multibarrier systems, JR Lloyd
|
7/11/2013 |
2 MB |
|
EF5 Registration Form
|
25/09/2014 |
89 KB |
|
EF5_Handout for the CMET Session
|
20/10/2014 |
189 KB |
|
EF5_PL1_Conclusions and Recommendations out of the EURADWASTE 2013 Conference, G. Buckau, JRC-ITU
|
3/11/2014 |
1 MB |
|
EF5_PL1_Horizon 2020 Euratom Research & Training programme in radioactive waste management, C. Davies
|
3/11/2014 |
483 KB |
|
EF5_PL1_Introduction IGD-TP Exchange Forum no 5, M. Hammarström
|
3/11/2014 |
402 KB |
|
EF5_PL1_Technical Working Group sessions, Instructions, J. Delay, IGD-TP
|
3/11/2014 |
287 KB |
|
EF5_PL1_The ENEN Association and its missions: an update looking beyond its 10th Birthday, W. Ambrosini, ENEN
|
3/11/2014 |
3 MB |
|
EF5_PL1_Waste management from a local stakeholder perspective, R. Persson
|
3/11/2014 |
3 MB |
|
EF5_PL1_What does the public really want when engaging with the nuclear industry, L. Boucher
|
3/11/2014 |
941 KB |
|
EF5_PL2_CMET session – IGD-TP’s input for the development of a voluntary accreditation scheme for geological disposal
|
3/11/2014 |
1 MB |
|
EF5_PL2_Conclusions and way forward, M. Hammarström
|
3/11/2014 |
785 KB |
|
EF5_PL2_IGD-TP Knowledge Management Portal Proposal, Documill Oy
|
3/11/2014 |
953 KB |
|
EF5_PL2_Report on the Outcomes of the Walkabout (CMET session)
|
3/11/2014 |
1 MB |
|
EF5_Report on TWG1 – Safety Case: Handling of uncertainties
|
3/11/2014 |
81 KB |
|
EF5_Report on TWG2 – Microbiology
|
3/11/2014 |
1 MB |
|
EF5_Report on TWG3 – Information Exchange Platform for SNETP and IGDTP
|
3/11/2014 |
123 KB |
|
EF5_Report on TWG4 – Priorities and lessons learned after 4 years of implementation of SR
|
3/11/2014 |
126 KB |
|
EF5_TWG3_Evolution of the waste forms in the future : an overview of the French approach, C. Martin, Andra
|
3/11/2014 |
152 KB |
|
EF5_WG-1_Management-of-Uncertainties
|
6/11/2014 |
238 KB |
|
EF5_WG-3_Introduction_Agenda
|
3/11/2014 |
91 KB |
|
EF5_WG-4_Safety and SF&RAW matrix and review of the SF&RAW management in Bulgaria, I. Ivanov, TU Sofia
|
3/11/2014 |
812 KB |
|
EF5_WG-4_SITEX-II, for developing an international Expertise function network, D. Pellegrini, IRSN
|
3/11/2014 |
451 KB |
|
EF5_WG-4_The JOPRAD Project: A step towards a Joint Programming on Radioactive Waste Disposal RD&D, J. Delay, Andra
|
3/11/2014 |
1 MB |
|
EF5_WG1_Andra’s Strategy and Approach for Management of Uncertainties in Post-Closure Safety of Geological Disposal, L. Griffault, andra
|
3/11/2014 |
1 MB |
|
EF5_WG1_Assessment Timescales and Complementary Safety Arguments, D. Galson
|
3/11/2014 |
238 KB |
|
EF5_WG1_Comparison of probabilistic and alternative evidence theoretical methods for the handling of parameter uncertainties resulting from variability and/or partial ignorance in safety cases, R. Barthel, BS
|
3/11/2014 |
1 MB |
|
EF5_WG1_Fast Computational Methods for Handling Large Scale Data Uncertainty Problems, R. Wittum
|
3/11/2014 |
2 MB |
|
EF5_WG1_Information exchange: the role of NAWG in the past and the way forward tomorrow, R. Alexander, Bedrock Geoscience
|
3/11/2014 |
595 KB |
|
EF5_WG1_Introduction on the working group session
|
3/11/2014 |
66 KB |
|
EF5_WG1_Managing uncertainties – Assessment Timescales and Complementary Safety Arguments, D. Galson
|
3/11/2014 |
238 KB |
|
EF5_WG1_Managing uncertainties in the safety case, Quantifying uncertainty: Challenges for ONDRAF/NIRAS, M. Capouet
|
3/11/2014 |
482 KB |
|
EF5_WG1_Natural Analogues for the Finnish Safety Case, B. Pastina, Posiva
|
3/11/2014 |
808 KB |
|
EF5_WG1_Overview of advantages and drawbacks of different methods for sensitivity analysis in the context of performance assessment, D.-A. Becker, GRS
|
3/11/2014 |
364 KB |
|
EF5_WG1_Sensitivity Analyses: Theoretical Background, Use in the Safety Case, and Related Research Activities, KJ Roehlig, TU Clausthal
|
3/11/2014 |
293 KB |
|
EF5_WG1_Sensitivity Analysis of Probabilistic Dose Results in SKB’s License Application, A. Hedin, SKB
|
3/11/2014 |
1 MB |
|
EF5_WG1_Simplified approach to elicitation of expert judgement in quantification of uncertainty, M. Poole, RWM
|
3/11/2014 |
116 KB |
|
EF5_WG1_Uncertainty and sensitivity analysis methods used at Andra, J. Wendling, Andra
|
3/11/2014 |
948 KB |
|
EF5_WG2_Introduction
|
3/11/2014 |
1 MB |
|
EF5_WG2_Lithotrophic metabolism in the relation with microbiologically induced corrosion, Mikes Jiri, CHEMCOMEX
|
3/11/2014 |
693 KB |
|
EF5_WG2_Microbially induced corrosion under repository environments, P. Rajala, VTT Finland
|
3/11/2014 |
3 MB |
|
EF5_WG2_Microorganisms of radionuclides-contaminated soils of Chernobyl: in depth analysis of diversity and study of uranium-bacteria interactions, V. Chapon, CEA
|
3/11/2014 |
2 MB |
|
EF5_WG2_Remaining uncertainties regarding sulphide production, fluxes and concentrations in radioactive waste repositorie, K. Pedersen, Microbial Analytics, Sweden
|
3/11/2014 |
2 MB |
|
EF5_WG2_Sulphide issue in Olkiluoto – hydrogeochemical considerations, P. Pitkänen, Posiva
|
3/11/2014 |
2 MB |
|
EF5_WG3_Fuel data needs in Posiva’s safety case, B. Pastina, Posiva
|
3/11/2014 |
757 KB |
|
EF5_WG3_Nugenia Research Topics in Spent Fuel Management (TA 5) and Potential Implications for Disposal. D. Hambley, NNL
|
3/11/2014 |
288 KB |
|
EF5_WG3_Progress and R&D needs for radioactive waste conditioning and disposal for future fuel cycles: a UK perspective, N. Hyatt, University of Sheffield, UK
|
3/11/2014 |
1 MB |
|
EF5_WG3_SNETP-ESNII Gen IV reactors, related fuel cycle and disposal issues, M. Sepielli (SNETP Governing Board)
|
3/11/2014 |
4 MB |
|
EF5_WG3_The SKB requirements of the HLW waste intended for the KBS-3 repository, L. Morén, SKB, Sweden
|
3/11/2014 |
430 KB |
|
EF5_WG3_The Sustainable Nuclear Energy Technology Platform (SNETP), Fuel Cycles and Interfaces with Geological Disposal, R. Stainsby, NNL
|
3/11/2014 |
761 KB |
|
EF5_WG4_Achievements and way forward for the IGD-TP since its inception, J. Delay, IGD-TP
|
3/11/2014 |
344 KB |
|
EF5_WG4_COMS-WD, E. Neeft, COVRA
|
3/11/2014 |
1 MB |
|
EF5_WG4_FIRST-Nuclides: Outcome, Open Questions and Steps Forward, B. Kienzler, KIT-INE
|
3/11/2014 |
1 MB |
|
EF5_WG4_Safety and SF&RAW matrix and review of the SF&RAW management in Bulgaria, I. Ivanov, TU Sofia
|
3/11/2014 |
812 KB |
|
EF6 – PL1 – 1 – Monica Hammarström
|
6/11/2015 |
294 KB |
|
EF6 – PL1 – 2 – Bruce Cairns
|
6/11/2015 |
2 MB |
|
EF6 – PL1 – 3 – Christophe Davies
|
6/11/2015 |
879 KB |
|
EF6 – PL1 – 4 – Nathalie Impens
|
6/11/2015 |
1 MB |
|
EF6 – PL1 – 5 – Lucy Bailey
|
6/11/2015 |
1 MB |
|
EF6 – PL1 – 6 – James Rubenstone
|
6/11/2015 |
760 KB |
|
EF6 – PL1 – 7 – Ray Kowe
|
6/11/2015 |
2 MB |
|
EF6 – PL2b – 1 – Johan Bertrand Modern2020
|
6/11/2015 |
878 KB |
|
EF6 – PL2b – 2 – Xavier Bourbon CEBAMA
|
6/11/2015 |
441 KB |
|
EF6 – PL2b – 3 – Birgitta Kalinowski MIND
|
6/11/2015 |
3 MB |
|
EF6 – PL3 – 1 – Annika Schaefers PEBS
|
6/11/2015 |
1 MB |
|
EF6 – PL3 – 2 – Bernhard Kienzler FIRST Nuclides
|
6/11/2015 |
2 MB |
|
EF6 – PL3 – 3 – Johan Bertrand MODERN
|
6/11/2015 |
2 MB |
|
EF6 – PL3 – 4 – Lena Evins REDUPP
|
6/11/2015 |
1 MB |
|
EF6 – PL4 – 1 – Cristiano Padovani – Novel Thermal treatment
|
6/11/2015 |
167 KB |
|
EF6 – PL4 – 2 – Patrik Sellin – Bentonite homogenisation
|
6/11/2015 |
2 MB |
|
EF6 – PL4 – 3 – Marcus Altmaier – CORI
|
6/11/2015 |
183 KB |
|
EF6 – PL4 – 4 – Lena Evins – Spent fuel dissolution
|
6/11/2015 |
451 KB |
|
EF6 – PL4 – 5 – Jonathan Martin Conclusion
|
6/11/2015 |
454 KB |
|
EF6 Agenda
|
14/10/2015 |
180 KB |
|
EF6_PL1_Welcome_Jon Martin
|
26/09/2017 |
1 MB |
|
EF6_TWG1 – Dimitre Assenov, Nano Flex HLW
|
6/11/2015 |
6 MB |
|
EF6_TWG1 – E. Curti, PSI
|
12/11/2015 |
1 MB |
|
EF6_TWG1 – Eric Smith, Energy Solutions
|
6/11/2015 |
4 MB |
|
EF6_TWG1 – Laurence Petit, Andra
|
6/11/2015 |
1 MB |
|
EF6_TWG1 – Maria Lindberg, Studsvik
|
6/11/2015 |
770 KB |
|
EF6_TWG1 – Mark Rogers, Costain
|
6/11/2015 |
1 MB |
|
EF6_TWG1 – Neil Hyatt, University of Sheffield
|
6/11/2015 |
3 MB |
|
EF6_TWG1 – Steve Swanton, AMEC-FW
|
6/11/2015 |
798 KB |
|
EF6_TWG1 summary – C Padovani
|
6/11/2015 |
131 KB |
|
EF6_TWG1- Anthony Banford, NNL
|
6/11/2015 |
1 MB |
|
EF6_TWG1- Jan Decker, Belgoprocess
|
6/11/2015 |
2 MB |
|
EF6_TWG2 – Antonio Gens, Universitat Politecnica Catalunya
|
6/11/2015 |
725 KB |
|
EF6_TWG2 – Claude Gatabin, CEA
|
6/11/2015 |
622 KB |
|
EF6_TWG2 – Erika Holt, VTT
|
6/11/2015 |
542 KB |
|
EF6_TWG2 – Gabriel Wittum TechSim, G-CSC, U Frankfurt
|
6/11/2015 |
1 MB |
|
EF6_TWG2 – Javier Samper, University of A Coruña
|
6/11/2015 |
91 KB |
|
EF6_TWG2 – Jean Talandier, Andra
|
6/11/2015 |
999 KB |
|
EF6_TWG2 – Jiri Mikes, TERAMED s.r.o
|
6/11/2015 |
146 KB |
|
EF6_TWG2 – Jon Harrington, British Geological Survey
|
6/11/2015 |
1 MB |
|
Ef6_TWG2 – Kari Koskinen, POSIVA
|
6/11/2015 |
575 KB |
|
EF6_TWG2 – Klaus Wieczorek, GRS
|
6/11/2015 |
90 KB |
|
EF6_TWG2 – Kristof Schuster, BGR
|
6/11/2015 |
762 KB |
|
EF6_TWG2 – Markus Olin, VTT Technical Research Centre of Finland
|
6/11/2015 |
236 KB |
|
EF6_TWG2 – Matt White, Galson Sciences Limited
|
6/11/2015 |
198 KB |
|
EF6_TWG2 – Nadia Mokni, IRSN
|
6/11/2015 |
1 MB |
|
EF6_TWG2 – Niels Giroud, NAGRA
|
6/11/2015 |
382 KB |
|
EF6_TWG2 – Olivier Leupin, NAGRA
|
6/11/2015 |
2 MB |
|
EF6_TWG2 – Patrik Sellin, SKB
|
6/11/2015 |
406 KB |
|
EF6_TWG2 – R. Charlier, University of Liege
|
6/11/2015 |
946 KB |
|
EF6_TWG2 – Rebecca Lunn, University of Strathclyde
|
6/11/2015 |
435 KB |
|
EF6_TWG2 – Vaclava Havlova, UJV Rez, a.s.
|
6/11/2015 |
632 KB |
|
EF6_TWG2 – Vasileios Mantikos, Imperial College London
|
6/11/2015 |
460 KB |
|
EF6_TWG2 – Victoria Villar, CIEMAT
|
6/11/2015 |
400 KB |
|
EF6_TWG3 – Eric Giffaut Andra
|
6/11/2015 |
958 KB |
|
EF6_TWG3 – Johan Vandenborre, SUBATECH
|
6/11/2015 |
2 MB |
|
EF6_TWG3 – M. Altmaier, KIT- INE
|
6/11/2015 |
590 KB |
|
EF6_TWG3 – Mireia Grivé, Amphos 21 Consulting
|
6/11/2015 |
1 MB |
|
EF6_TWG3 – Vanessa Montoya, KIT-INE
|
6/11/2015 |
1 MB |
|
EF6_TWG3 – Virginie Blin, CEA
|
6/11/2015 |
780 KB |
|
EF6_TWG4 – B. Kienzler, KIT-INE
|
12/11/2015 |
1,014 KB |
|
EF6_TWG4 – C. Martin, Andra
|
12/11/2015 |
889 KB |
|
EF6_TWG4 – D. Bosbach, FZ Jülich
|
12/11/2015 |
860 KB |
|
EF6_TWG4 – D. H. Wegen, JRC-ITU
|
12/11/2015 |
2 MB |
|
EF6_TWG4 – I . Farnan University of Cambridge
|
12/11/2015 |
3 MB |
|
EF6_TWG4 – K. Ollila and E. Myllykylä, VTT
|
12/11/2015 |
1 MB |
|
EF6_TWG4 – L.Z. Evins, SKB
|
12/11/2015 |
1 MB |
|
EF6_TWG4 – O. Roth, Studsvik
|
12/11/2015 |
3 MB |
|
EF7_S1_Introduction, M. Hammarström
|
2/11/2016 |
476 KB |
|
EF7_S1_National policy in Spain , P. Zuloaga
|
2/11/2016 |
3 MB |
|
EF7_S1_R&D activities in Ukraine towards geological disposal of radioactive waste , I. Shybetsky
|
2/11/2016 |
8 MB |
|
EF7_S1_RD&D for the future, REs, C. Bruggeman
|
2/11/2016 |
550 KB |
|
EF7_S1_RD&D for the future, TSO, C. Serres
|
2/11/2016 |
329 KB |
|
EF7_S1_RD&D for the future, WMO, F. Plas
|
2/11/2016 |
258 KB |
|
EF7_S1_Update from the European Commission C. Davies
|
2/11/2016 |
1 MB |
|
EF7_S2_BELBaR end of project overview, P. Sellin
|
2/11/2016 |
992 KB |
|
EF7_S2_DOPAS end of project overview, J. Hansen
|
2/11/2016 |
2 MB |
|
EF7_S2_Focus on less advanced programmes, J. Slovak
|
2/11/2016 |
2 MB |
|
EF7_S2_LUCOEX end of project overview, E. Thurner
|
2/11/2016 |
5 MB |
|
EF7_S3_Conclusion, M. Hammartsrom
|
2/11/2016 |
349 KB |
|
EF7_S3_Report from WG1 – J. Hansen
|
2/11/2016 |
488 KB |
|
EF7_S3_Report from WG2 – N. Diomidis
|
2/11/2016 |
234 KB |
|
EF7_S3_Report from WG3 – K. Wieczorek
|
2/11/2016 |
971 KB |
|
EF7_S3_Report from WG4 – A. Sjoland
|
2/11/2016 |
2 MB |
|
EF7_WG-1_Countries without NPPs needs convincing solutions for the safe and affordable disposal of RW, A. Savidou
|
2/11/2016 |
84 KB |
|
EF7_WG-1_Development of optimisation methodology and methodology illustration, D. Galson
|
2/11/2016 |
1 MB |
|
EF7_WG-1_Introduction, J. Hansen & J. Andersson
|
2/11/2016 |
635 KB |
|
EF7_WG-1_Looking for rational environmentally friendly approach for development of concept for safe nuclear waste repository in preparing for future projects, I. Ivanov
|
2/11/2016 |
342 KB |
|
EF7_WG-1_Pyro(hydro)lysis of Spent Ion Exchange Resins for the Disposal of Organic-Free Radioactive Waste, HG Jung
|
2/11/2016 |
765 KB |
|
EF7_WG-1_Reducing the cost of waste containers for decommissioning and geological disposal, J. Hardy
|
2/11/2016 |
1 MB |
|
EF7_WG-2_Candidate Material Solutions for the Design of Nuclear Waste Storage Canisters, S. Holdsworth
|
2/11/2016 |
735 KB |
|
EF7_WG-2_Czech Disposal Canister Programme, I. Pospiskova
|
2/11/2016 |
817 KB |
|
EF7_WG-2_Developments of the Canadian Copper Coated Used Fuel Container, P. Keech
|
2/11/2016 |
3 MB |
|
EF7_WG-2_Electroplated copper and alternative design possibilities,A. McClusky
|
2/11/2016 |
2 MB |
|
EF7_WG-2_Experience in manufacturing of nuclear storage containers via casting, forging and machining techniques, M. Blackmore
|
2/11/2016 |
3 MB |
|
EF7_WG-2_Implications of canister design and materials on closure welding for deep geological disposal canisters for high level nuclear waste and spent fuel, C. Punshon
|
2/11/2016 |
5 MB |
|
EF7_WG-2_Mechanical-Corrosion Effects on the Durability of High Level Waste and Spent Fuel Disposal Containers, C. Padovani
|
2/11/2016 |
1 MB |
|
EF7_WG-2_Overview of Cold Spray Coating Technology, H. Lovelock
|
2/11/2016 |
3 MB |
|
EF7_WG-2_Sharing information on container materials for High Level Waste and Spent Nuclear Fuel (IGD-TP activity JA11a, C. Padovani
|
2/11/2016 |
68 KB |
|
EF7_WG-2_Technical Requirements for High Level Waste Disposal Containers with regard to their Retrievability during Operation and Recovery after Repository Closure, T. Orellana Perez
|
2/11/2016 |
248 KB |
|
EF7_WG-3_Clay interactions at high temperature by molecular dynamics, thermodynamic modelling and lab analysis, M. Olin
|
2/11/2016 |
1 MB |
|
EF7_WG-3_Contribution to numerical modelling of high temperature clay interactions J. Samper
|
2/11/2016 |
1 MB |
|
EF7_WG-3_Coupled THMC interactions at temperature beyond 130 °C, F. Claret
|
2/11/2016 |
2 MB |
|
EF7_WG-3_Effects of elevated temperatures on the EBS in clay formations, T. Schäfer
|
2/11/2016 |
2 MB |
|
EF7_WG-3_Flow in saturated bentonite under elevated temperatures, K. Daniels
|
2/11/2016 |
1 MB |
|
EF7_WG-3_Hot Mock-ups at Joseph URL, J. Svoboda
|
2/11/2016 |
808 KB |
|
EF7_WG-3_HotBENT – High Temperature Bentonite Project Ideas, F. Kober
|
2/11/2016 |
2 MB |
|
EF7_WG-3_Introduction_High T Clay_I. Gaus
|
2/11/2016 |
1 MB |
|
EF7_WG-3_Research topics from the state of the art on THMCB aspects of thermal compatibility of clays, A. Meleshyn
|
2/11/2016 |
2 MB |
|
EF7_WG-3_Thermo-Hydro-Mechanical Effects of a Geological Repository at Macro-Scale, Hubschwerlen
|
2/11/2016 |
3 MB |
|
EF7_WG-4_Development of depletion models for radionuclide inventory, decay heat and source term estimation in discharged fuel, S. Caruso
|
2/11/2016 |
4 MB |
|
EF7_WG-4_Introduction, A. Sjoland & M. Sepielli
|
2/11/2016 |
2 MB |
|
EF7_WG-4_Safety of extended interim dry storage of spent nuclear fuel (SAEXFUEL), J. Cobos
|
2/11/2016 |
977 KB |
|
EF7_WG-4_SF inventory calculations in SPIRE project : current limits and expected improvements, D. Rochman
|
2/11/2016 |
3 MB |
|
EF7_WG-4_SNETP IGD-TP Interface, D. Hambley
|
2/11/2016 |
2 MB |
|
EF7_WG-4_SNETP, M. Seppelli
|
2/11/2016 |
1 MB |
|
EF7_WG-4_Spent fuel characterization with emphasis on Russian type reactors, J. Miksova
|
2/11/2016 |
385 KB |
|
EF7_WG-4_Spent fuel online monitoring: opportunities for new technologies, P. Finocchiaro
|
2/11/2016 |
3 MB |
|
EF7_WG-4_The proposed SPIRE Project: challenge, scope, impact, P. Jansson
|
2/11/2016 |
2 MB |
|
EF7_WG-4_The proposed SPIRE Project: measurement techniques applied on SNF, P. Schillebeeckx
|
2/11/2016 |
5 MB |
|
EF7_WG-4_Thermal modelling of high heat generating wastes in the UK programme, R. Winsley
|
2/11/2016 |
1 MB |
|
EF7-WG-1_Industrialisation and optimisation of the KBS-3 repositories, J. Andersson
|
2/11/2016 |
5 MB |
|
EF7-WG-2-Bollingerfehr_Canister_Design
|
2/11/2016 |
3 MB |
|
ERDO Association Press Release
|
8/01/2021 |
135 KB |
|
ERICA – D1: Progress on the Production of the Web-based Effects Database: FREDERICA
|
7/02/2022 |
865 KB |
|
ERICA – D10: Application of ERICA Integrated Approach at case study sites
|
24/01/2022 |
2 MB |
|
ERICA – D4a: Ecological Risk Characterisation: An Interim Method for the ERICA Integrated Approach
|
24/01/2022 |
938 KB |
|
ERICA – D4b: Overview of Ecological Risk Characterisation Methodologies
|
24/01/2022 |
2 MB |
|
ERICA – D5: Derivation of Predicted-No-Effect-Dose-Rate values for ecosystems (and their sub-organisational levels) exposed to radioactive substances
|
24/01/2022 |
1 MB |
|
ERICA – D7: Summary of all ERICA EUG Events
|
24/01/2022 |
1 MB |
|
ERICA – D7a: First EUG Event – Part 1, Discussion of ERICA Workplan.
|
7/02/2022 |
657 KB |
|
ERICA – D7a: First EUG Event Part 2, Briefing notes on assessment frameworks and knowledge gaps.
|
7/02/2022 |
901 KB |
|
ERICA – D7b: Briefing Notes from The Second Thematic EUG Event
|
7/02/2022 |
4 MB |
|
ERICA – D7c: Transcripts from The First Generic EUG Event Ecological Risk Assessment and Management
|
7/02/2022 |
2 MB |
|
ERICA – D7d: Transcript from the Third Thematic EUG Event: Decision-making and stakeholder involvement
|
7/02/2022 |
652 KB |
|
ERICA – D7e: Scientific Uncertainties: Transcript from the EUG Workshop
|
7/02/2022 |
911 KB |
|
ERICA – D7f: The ERICA Consensus Seminar
|
24/01/2022 |
563 KB |
|
ERICA – D7g: Summary of the EUG event on: management, compliance and demonstration
|
7/02/2022 |
722 KB |
|
ERICA – D7h: Summary of the EUG Tool Testing Day Copenhagen, 08 December 2006
|
7/02/2022 |
268 KB |
|
ERICA – D7i: Summary of stakeholder involvement in the UK case study
|
7/02/2022 |
328 KB |
|
ERICA – D8: Considerations for applying the ERICA Integrated Approach
|
7/02/2022 |
2 MB |
|
ERICA – D9: Application of FASSET framework at case study sites
|
24/01/2022 |
1 MB |
|
ERICA – Final report
|
18/01/2022 |
109 KB |
|
ERICA – Mid-Term Review
|
24/01/2022 |
63 KB |
|
ESDRED – 1st Publishable Executive Summary
|
25/01/2022 |
209 KB |
|
ESDRED – 2nd Publishable Executive Summary
|
25/01/2022 |
222 KB |
|
ESDRED – 3rd Publishable Executive Summary
|
25/01/2022 |
506 KB |
|
ESDRED – 4th Publishable Executive Summary
|
25/01/2022 |
860 KB |
|
ESDRED – Final summary report and global evaluation of the project
|
25/01/2022 |
4 MB |
|
ESDRED – Mod 4-WP3.2-D 4.3-R1: Test Plan for Full Scale Demonstration of a Shotcrete Plug
|
9/02/2022 |
2 MB |
|
ESDRED – Mod1-WP4-D4: Report on In-Situ Test Configurations
|
7/02/2022 |
5 MB |
|
ESDRED – Mod1-WP5-D5: Report on Testing Non-Intrusive Monitoring Systems
|
7/02/2022 |
2 MB |
|
ESDRED – Mod2-WP1-D1: Input data and functional requirements
|
7/02/2022 |
5 MB |
|
ESDRED – Mod3-WP4-D5: Report on Emplacement /Transport Tests
|
9/02/2022 |
4 MB |
|
ESDRED – Mod4-WP3.2-D8.1: Report on Short Plug Test Results
|
9/02/2022 |
4 MB |
|
ESDRED – Mod5-WP10-D9: Confidence Building & COWAM 2
|
9/02/2022 |
2 MB |
|
ESDRED – Mod5-WP2-D2: Proceedings of the Second Low pH Workshop
|
9/02/2022 |
7 MB |
|
ESDRED – Mod5-WP7-D10: Proceedings of international event
|
9/02/2022 |
17 MB |
|
ESDRED – Mod5-WP9-D12: Project Results Leaflet
|
9/02/2022 |
1 MB |
|
ESDRED – Mod5-WP9-D6: Project presentation
|
9/02/2022 |
1 MB |
|
ESDRED – Mod6-WP1.1-D1: Compilation of Input Data and Functional Requirements Common to all Modules
|
9/02/2022 |
2 MB |
|
ESDRED – Mod6-WP2.1-D3: Report on Common Features of Design Studies
|
9/02/2022 |
6 MB |
|
ESDRED – Module 1 (Buffer Construction Technologies for Horizontal Disposal Concepts), Final Report
|
7/02/2022 |
5 MB |
|
ESDRED – Module 2 (Waste canister transfer and emplacement technology), Final Report
|
25/01/2022 |
4 MB |
|
ESDRED – Module 3 (Heavy load emplacement technology), Final Report
|
25/01/2022 |
2 MB |
|
ESDRED – Module 4 (Temporary Sealing Technology), Final Report
|
25/01/2022 |
2 MB |
|
EURAD D1.10: Identification of Subject Matter/Theme Experts
|
16/06/2022 |
644 KB |
|
EURAD D1.13: List of members of the Civil Society group
|
16/06/2022 |
616 KB |
|
EURAD D1.7: EURAD Roadmap, extended with Competence Matrix
|
16/06/2022 |
300 KB |
|
EURAD D1.8: Process for the extensive update of the EURAD SRA
|
16/06/2022 |
322 KB |
|
EURAD D11.1: Screening and review of existing/available knowledge management approaches and/or tools
|
17/06/2022 |
549 KB |
|
EURAD D11.2: List of selected demonstration cases, criteria for final selection, proposal and estimation of effort and resources
|
17/06/2022 |
219 KB |
|
EURAD D12.4: Guidance on Cost Assessment and Financing Schemes of Radioactive Waste Management Programmes
|
17/06/2022 |
1 MB |
|
EURAD D13.1: List of training needs from Research, Development and Demonstration and Strategic Studies Work Packages
|
17/06/2022 |
1 MB |
|
EURAD D13.2: Mapping of available course materials
|
17/06/2022 |
828 KB |
|
EURAD D13.5: Quality criteria and training specifications as a reference guide of requirements and expectations of the training courses to be developed
|
17/06/2022 |
376 KB |
|
EURAD Deployment Plan
|
17/06/2020 |
1 MB |
|
EURAD Newsletter #1 – June 2020
|
24/06/2020 |
760 KB |
|
EURAD Newsletter #3 – December 2020
|
7/01/2021 |
1 MB |
|
EURAD Newsletter #5 – June 2021
|
30/06/2021 |
1 MB |
|
EURAD Newsletter #6 – October 2021
|
27/10/2021 |
935 KB |
|
EURAD Newsletter #7 – December 2021
|
16/12/2021 |
747 KB |
|
EURAD Newsletter #8 – April 2022
|
13/04/2022 |
479 KB |
|
EURAD Newsletter #9 – June 2022
|
28/06/2022 |
2 MB |
|
EURAD Roadmap
|
14/06/2020 |
3 MB |
|
EURAD Roadmap User Guide
|
17/06/2020 |
2 MB |
|
EURAD Strategic Research Agenda (SRA)
|
14/06/2020 |
2 MB |
|
EURAD Vision
|
14/06/2020 |
936 KB |
|
EURAD/ACED D2.10: HLW: Report describing the selected experiments and the existing/expected experimental results
|
16/06/2022 |
1 MB |
|
EURAD/ACED D2.11: ILW- Report describing the selected experiments and the existing/expected experimental results
|
16/06/2022 |
3 MB |
|
EURAD/ACED D2.18: Model abstraction methods for upscaling and integration of process knowledge in reactive transport models for geological disposal of radioactive waste
|
16/06/2022 |
2 MB |
|
EURAD/ACED D2.4: Treatment of chemical evolutions in national programmes
|
16/06/2022 |
15 MB |
|
EURAD/ACED D2.5: Experiments and numerical model studies on interfaces
|
16/06/2022 |
5 MB |
|
EURAD/ACED D2.6: Modelling of the steel-clay interface – approaches, first results and model refinements
|
16/06/2022 |
7 MB |
|
EURAD/ACED D2.8: First results on the thermodynamic databases and reactive transport models for steel-cement interfaces at high temperature
|
16/06/2022 |
3 MB |
|
EURAD/CORI D3.1: State-of-the-art report on cement-organic-radionuclide interactions
|
16/06/2022 |
2 MB |
|
EURAD/CORI D3.3: Training Materials
|
16/06/2022 |
477 KB |
|
EURAD/DONUT D4.1: State Of The Art in the fields of numerical analysis and scientific computing
|
16/06/2022 |
3 MB |
|
EURAD/FUTURE D5.1: State-of-the-Art report on the understanding of radionuclide retention and transport in clay and crystalline host rocks
|
16/06/2022 |
5 MB |
|
EURAD/GAS D6.1: Initial State of the Art on Gas Transport in Clayey Materials
|
16/06/2022 |
68 MB |
|
EURAD/GAS D6.3: Training Materials of the 1st GAS/HITEC joint training course
|
16/06/2022 |
41 MB |
|
EURAD/HITEC D7.1: Initial State-Of-The-Art on THM Behaviour of I) Buffer Clay Materials and of II) Host Clay Materials
|
17/06/2022 |
12 MB |
|
EURAD/MAGIC D16.3: Report on selected experiments for assessing the evolution of concrete, their mechanical safety function and performance targets
|
17/06/2022 |
3 MB |
|
EURAD/ROUTES – D9.12: Studies and plans for developing shared solutions for radioactive waste management in Europe
|
16/06/2022 |
1 MB |
|
EURAD/ROUTES – D9.15: Scoping of ROUTES, Initial ICS Input and ICS Action Plan
|
16/06/2022 |
1 MB |
|
EURAD/ROUTES – D9.16: Implementation of the ROUTES ICS action plan first phase – CS discussion and input focused on the first topic identified in the ICS action plan
|
16/06/2022 |
3 MB |
|
EURAD/ROUTES – D9.4: Overview of existing work on categorization/classification of RWs in participating states
|
16/06/2022 |
3 MB |
|
EURAD/SFC D8.1: Spent Fuel Characterization and Evolution Until Disposal
|
17/06/2022 |
2 MB |
|
EURAD/UMAN D10.10: UMAN – Analysis and description of groups of different actors
|
17/06/2022 |
1 MB |
|
EURADWASTE’19 Draft Programme
|
2/05/2019 |
1 MB |
|
EURADWASTE’19 First Announcement
|
18/12/2018 |
2 MB |
|
Figure on the organisation of the IGD-TP
|
28/08/2012 |
104 KB |
|
First EURAD Annual Event (2021) Flyer
|
7/01/2021 |
336 KB |
|
First EURAD Annual Event 2021 Agenda
|
17/03/2021 |
775 KB |
|
First Nuclides Project Poster
|
26/03/2018 |
220 KB |
|
First-Nuclides 1st Annual Newsletter
|
26/03/2018 |
731 KB |
|
First-Nuclides 1st Annual Workshop Proceedings
|
26/03/2018 |
28 MB |
|
First-Nuclides 2nd Annual workshop proceedings
|
26/03/2018 |
20 MB |
|
First-Nuclides 3rd Annual Newsletter
|
26/03/2018 |
2 MB |
|
First-Nuclides D 4.1 Modelling of migration/retention processes of fission products in the spent fuel structure
|
26/03/2018 |
1 MB |
|
First-Nuclides D1.1 Characterisation of spent fuel samples
|
26/03/2018 |
594 KB |
|
First-Nuclides D1.2 Description of methodologies and tools to be applied
|
26/03/2018 |
3 MB |
|
First-Nuclides D1.3 Characterisation of spent uranium fuel used for experimental work
|
26/03/2018 |
3 MB |
|
First-Nuclides D2.1 Status of fission gas release studies (12 months)
|
26/03/2018 |
208 KB |
|
First-Nuclides D2.1 Status of fission gas release studies (24 months)
|
26/03/2018 |
213 KB |
|
First-Nuclides D2.1 Status of fission gas release studies (34 months)
|
26/03/2018 |
443 KB |
|
First-Nuclides D2.2 Status of Rim and Grain Boundary Experiments (12 months)
|
26/03/2018 |
211 KB |
|
First-Nuclides D2.2 Status of Rim and Grain Boundary Experiments (24 months)
|
26/03/2018 |
213 KB |
|
First-Nuclides D2.2 Status of Rim and Grain Boundary Experiments (34 months)
|
26/03/2018 |
402 KB |
|
First-Nuclides D3.1 Dissolution based fast/instant radionuclide release studies (12 months)
|
26/03/2018 |
185 KB |
|
First-Nuclides D3.1 Dissolution based fast/instant radionuclide release studies (24 months)
|
26/03/2018 |
234 KB |
|
First-Nuclides D3.1 Dissolution based fast/instant radionuclide release studies (33 months)
|
26/03/2018 |
301 KB |
|
First-Nuclides D4.1 Update to: Modelling of migration/retention processes of fission products in the spent fuel structure
|
26/03/2018 |
538 KB |
|
First-Nuclides D4.2 Models for fission products release from spent nuclear fuel Final Report
|
26/03/2018 |
1 MB |
|
First-Nuclides D5.1 IRF database – State of the Art report (3rd update)
|
11/08/2022 |
4 MB |
|
First-Nuclides D5.1 State of the Art
|
26/03/2018 |
1 MB |
|
First-Nuclides Final Report
|
26/03/2018 |
2 MB |
|
First-Nuclides Proceedings of 3rd Annual Workshop
|
26/03/2018 |
13 MB |
|
First-Nuclides Second Annual Newsletter
|
26/03/2018 |
1 MB |
|
First-Nuclides State of the Art Final Report
|
26/03/2018 |
3 MB |
|
FISA 2019 First Announcement
|
18/12/2018 |
540 KB |
|
FORGE additional reports
|
20/09/2018 |
8 MB |
|
FORGE WP1 reports
|
20/09/2018 |
37 MB |
|
FORGE WP2 reports
|
20/09/2018 |
12 MB |
|
FORGE WP3 reports
|
20/09/2018 |
95 MB |
|
FORGE WP4 reports
|
20/09/2018 |
76 MB |
|
FORGE WP5 reports
|
20/09/2018 |
48 MB |
|
FORGE: Explatory Data Analysis of the Large Scale Gas Injection Test (Lasgit)
|
20/09/2018 |
19 MB |
|
FORGE: Observations of heterogeneous pore pressure distributions in clay-rich materials
|
20/09/2018 |
3 MB |
|
FORGE: The role of stress history on the flow of fluids through fractures
|
20/09/2018 |
5 MB |
|
FP5_WG2_Improving realism and reducing pessimisms in the safety case for geological disposal of ILW, J. Small, NNL, UK
|
3/11/2014 |
1 MB |
|
FUNMIG – Final Scientific and Technical Report
|
27/01/2022 |
3 MB |
|
Grimsel Test Site Newsletter 1 (April 2019)
|
16/05/2019 |
2 MB |
|
Grimsel Test Site Newsletter 2 (December 2019)
|
2/01/2020 |
5 MB |
|
Grimsel Test Site Newsletter 3 (June 2020)
|
3/08/2020 |
3 MB |
|
Grimsel Test Site Newsletter 4 (December 2020)
|
7/01/2021 |
2 MB |
|
Grimsel Test Site Newsletter 5 (July 2021)
|
26/07/2021 |
3 MB |
|
Grimsel Test Site Newsletter 6 (December 2021)
|
24/01/2022 |
5 MB |
|
Grimsel Test Site Newsletter 7 (July 2022)
|
4/08/2022 |
6 MB |
|
Grimsel Training Centre Announcement: EBS / Bentonite Course 2020
|
14/02/2020 |
675 KB |
|
Grimsel Training Centre Workshop Announcement: From geophysical field data to geological models – theory and hands-on workshop
|
16/05/2019 |
88 KB |
|
Grimsel Training Centre Workshop Announcement: In-situ Testing and Hydraulic Characterisation in URL
|
16/05/2019 |
437 KB |
|
IAEA – Design Principles and Approaches for Radioactive Waste Repositories
|
7/01/2021 |
7 MB |
|
IAEA International Conference on Radioactive Waste Management: Solutions for a Sustainable Future – Announcement and Call for Papers
|
19/01/2021 |
291 KB |
|
IAEA job description – radioactive waste disposal specialist
|
20/07/2021 |
193 KB |
|
IGD-TP – EF5 Presentations and outcomes
|
17/11/2014 |
3 MB |
|
IGD-TP – EF6 Presentations and outcomes
|
12/11/2015 |
4 MB |
|
IGD-TP Competence Maintenance, Education and Training Strategy and Action Plan for 2013-2016
|
24/04/2018 |
4 MB |
|
IGD-TP EF5 -Book of Abstracts
|
10/10/2014 |
612 KB |
|
IGD-TP EF5 -Book of Abstracts
|
10/10/2014 |
612 KB |
|
IGD-TP EF5 Agenda
|
10/10/2014 |
87 KB |
|
IGD-TP EF5 announcement
|
25/06/2014 |
266 KB |
|
IGD-TP EF6 – Announcement
|
1/07/2015 |
227 KB |
|
IGD-TP EF6 registration form
|
1/07/2015 |
647 KB |
|
IGD-TP EF7 Agenda
|
26/09/2017 |
539 KB |
|
IGD-TP EF7 Announcement
|
8/07/2016 |
288 KB |
|
IGD-TP EF7 Book of Abstracts
|
1/02/2018 |
958 KB |
|
IGD-TP Exchange Forum 8 – Agenda
|
27/11/2018 |
151 KB |
|
IGD-TP Exchange Forum 8 – Agenda and Attendee List
|
29/11/2018 |
240 KB |
|
IGD-TP Exchange Forum 8 – Day 1 – EURAD Founding Documents
|
29/11/2018 |
2 MB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 0900 – Jon Martin – Opening Session
|
7/12/2018 |
179 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 0915 – Ursula Borak – Welcome Address
|
11/01/2019 |
16 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 0930 – Christophe Davies – Euratom Programme (2014-2018/2019-20) – Status
|
7/12/2018 |
976 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 0940 – Marie Garcia – EURAD Overview and Organisation
|
7/12/2018 |
2 MB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1010 – Francis Claret – RD&D WP: Development and Improvement Of NUmerical methods and Tools for modelling coupled processes (DONUT)
|
7/12/2018 |
189 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1030 – Alexandre Dauzeres – RD&D WP: Assessment of Chemical Evolution of ILW and HLW Disposal Cells (ACED)
|
7/12/2018 |
241 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1050 – Séverine Levasseur – RD&D WP: Mechanistic understanding of gas transport in clay materials (GAS)
|
7/12/2018 |
242 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1140 – Markus Olin – RD&D WP: Influence of temperature on clay-based material behaviour (HITEC)
|
7/12/2018 |
289 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1200 – Marcus Altmaier – RD&D WP: Cement-Organics-Radionuclides-Interactions (CORI)
|
7/12/2018 |
466 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1220 – Dirk Bosbach – RD&D WP: Fundamental understanding of radionuclide retention (FUTuRE)
|
7/12/2018 |
217 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1240 – Joaquín Cobos – RD&D WP: Spent Fuel Characterization and Evolution Until Disposal (SFC)
|
7/12/2018 |
399 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1430 – Frank Lemy – SS WP: Uncertainty Management multi-Actor Network (UMAN)
|
7/12/2018 |
444 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1450 – Virginie Wasselin – SS WP: Waste management routes in Europe from cradle to grave (ROUTES)
|
7/12/2018 |
252 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1510a – Gunnar Buckau – Knowledge Management Activities
|
7/12/2018 |
394 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1510b – Panja Feuker – State of Knowledge WP
|
7/12/2018 |
298 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1510c – Dalibor Mateju – Guidance WP
|
7/12/2018 |
124 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1510d – Christophe Bruggeman – Training WP
|
7/12/2018 |
112 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1550 – Julien Dewogélhaëre – Interaction with Civil Society
|
7/12/2018 |
226 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1600a – Tara Beattie – EURAD Strategic Research Agenda and its Future Development
|
7/12/2018 |
701 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1600b – Rob Winsley – WMO College (IGD-TP)
|
7/12/2018 |
495 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1600c – Elisabeth Salat – TSO College (SITEX)
|
7/12/2018 |
681 KB |
|
IGD-TP Exchange Forum 8 – Day 1 (EURAD) 1600d – Christophe Bruggeman – RE College
|
7/12/2018 |
1,003 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 1 – 0930 – Jean-Michel Hoorelbecke – Introduction
|
7/12/2018 |
354 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 1 – 1000a – Philipp Herold – Knowledge and experience on retrievability of SF/HLW waste packages
|
7/12/2018 |
1 MB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 1 – 1000b – Neil Carr – UK’s approach to retrievability
|
7/12/2018 |
2 MB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 1 – 1000c – Jean-Michel Hoorelbecke – Demonstrator of HLW disposal canister retrieval
|
7/12/2018 |
2 MB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 1 – 1000d – Anni Fritzell – Canister retrieval status at SKB
|
7/12/2018 |
1 MB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 2 – 0930 – Michelle Cowley – Introduction
|
7/12/2018 |
203 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 2 – 1000 – Nathalie Texier-Mandoki – Ceramics as possible FUTURE alternative materials for the HLW overpack (Cigeo project)
|
7/12/2018 |
1 MB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 2 – 1050 – Nikitas Diomidis – Alternative coatings for disposal canisters
|
7/12/2018 |
1 MB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 2 – 1155 – Séverine Levasseur – Belgian Supercontainer Concept
|
7/12/2018 |
922 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 3 – 0940 – Peter Molnar – Site characterisation in the Hungarian early-stage programme
|
7/12/2018 |
3 MB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 3 – 1000 – Rob McLaverty – Preparation for site characterisation in the UK: a needs-driven exercise
|
7/12/2018 |
1,018 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 3 – 1020 – Bernd Frieg – Site characterisation in the final stage of selecting the site in sedimentary clay rock in Switzerland
|
7/12/2018 |
8 MB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 3 – 1130 – Peter Wikberg – Site characterisation in the Swedish crystalline rock before and after submitting the construction licence
|
7/12/2018 |
4 MB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) – Technical Session 3 – 1150 – Jacques Delay – Site characterisation in the French sedimentary/clay rock programme, close to construction licence submission
|
7/12/2018 |
2 MB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) 0845 – Jon Martin – Opening Session
|
7/12/2018 |
168 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) 0900 – Irina Gaus – Planning for the IGD-TP’s second decade
|
7/12/2018 |
871 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) 0915 – Jon Martin – WMO areas of interest outside of the EURAD scope
|
7/12/2018 |
488 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) 1430 – Jean-Michel Hoorelbecke – Technical Session Summary – 1: Technical issues in support of retrievability
|
7/12/2018 |
336 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) 1500 – Michelle Cowley – Technical Session Summary – 2: Heat Generating Waste Containers
|
7/12/2018 |
175 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) 1530 – Bernd Frieg – Technical Session Summary – 3: Progress in site investigation and characterisation techniques
|
7/12/2018 |
1 MB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) 1600a – Irina Gaus – Panel Discussion: Linking WMO RD&D programmes in different stages with the IGD-TP
|
7/12/2018 |
208 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) 1600b – Ole Kastbjerg – Panel Discussion: Danish WMO RD&D Perspective
|
7/12/2018 |
62 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) 1600c – Jeroen Bartol – Panel Discussion: The Netherlands WMO RD&D Perspective
|
7/12/2018 |
212 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) 1600d – Irina Gaus – Panel Discussion: Swiss WMO RD&D Perspective
|
7/12/2018 |
157 KB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) 1600e – Peter Wikberg – Panel Discussion: Finnish WMO RD&D Perspective
|
7/12/2018 |
1 MB |
|
IGD-TP Exchange Forum 8 – Day 2 (IGD-TP) 1600f – Peter Wikberg – Panel Discussion: Swedish WMO RD&D Perspective
|
7/12/2018 |
599 KB |
|
IGD-TP Exchange Forum 8 – First Announcement
|
12/07/2018 |
106 KB |
|
IGD-TP Exchange Forum 8 – Poster 1 – Philipp Herold – Retrievability in German SF/HLW Repository Concepts – Technical Solutions and Provisions for Implementation
|
7/12/2018 |
1 MB |
|
IGD-TP Exchange Forum 8 – Poster 11 – Christophe Bruggeman – Prediction of the Key Physico-Chemical Parameters of Geological Barriers Through Detailed Mineralogical Analysis: Case Study of the Boom Clay (Belgium)
|
7/12/2018 |
661 KB |
|
IGD-TP Exchange Forum 8 – Poster 12 – Christophe Bruggeman – Towards the use of Multiple State Variables in Hydrogeological Modelling Supporting Site Characterisation
|
7/12/2018 |
2 MB |
|
IGD-TP Exchange Forum 8 – Poster 13 – Christophe Bruggeman – A Multiscale Approach to Model Thermo-Hydro-Mechanical Behaviour of Plain Concrete During Early Stages of Construction
|
7/12/2018 |
913 KB |
|
IGD-TP Exchange Forum 8 – Poster 14 – Cornelius Fischer – Advanced Analysis of RN Migration in Fractured Crystalline Rock
|
7/12/2018 |
1 MB |
|
IGD-TP Exchange Forum 8 – Poster 15 – Zbynek Hlavac – Study of impact of the radiation on concrete structure behaviour
|
5/12/2018 |
1 MB |
|
IGD-TP Exchange Forum 8 – Poster 17 – Lara Duro – Modern Spent Fuel Dissolution in Failed Container Conditions (DISCO)
|
5/12/2018 |
2 MB |
|
IGD-TP Exchange Forum 8 – Poster 19 – Tim Heath – Probabilistic modelling of radionuclide release from a cementitious near field
|
5/12/2018 |
702 KB |
|
IGD-TP Exchange Forum 8 – Poster 20 – Xavier Gaona – Development and Improvement of Thermodynamic Understanding for the Nuclear Waste Disposal Safety Case
|
7/12/2018 |
123 KB |
|
IGD-TP Exchange Forum 8 – Poster 22 – Megan Barnett – Microorganisms in a Clay-Steel System
|
7/12/2018 |
1 MB |
|
IGD-TP Exchange Forum 8 – Poster 23 – Birgitta Kalinowski – Microbiology In Nuclear waste Disposal (MIND)
|
5/12/2018 |
2 MB |
|
IGD-TP Exchange Forum 8 – Poster 24 – Barbara Ferrucci – Preliminary Analysis of Gaseous 14C Radiological Impact in a Geological Repository Hosted in Salt Rock
|
7/12/2018 |
413 KB |
|
IGD-TP Exchange Forum 8 – Poster 25 – Isabel Pavia – Portuguese Involvement/Engagement in Radioactive Waste Management Related Activities
|
7/12/2018 |
3 MB |
|
IGD-TP Exchange Forum 8 – Poster 26 – Valentina Svitelman – Activities of the Russian Nuclear Safety Institute in the Context of Deep Geological Disposal Safety
|
7/12/2018 |
2 MB |
|
IGD-TP Exchange Forum 8 – Poster 27 – Marie Garcia – Modern2020 Project Finalisation
|
5/12/2018 |
1 MB |
|
IGD-TP Exchange Forum 8 – Poster 5 – Jean-Michel Hoorelbeke – Retrieval Test of High Level Waste in the Cigéo Project
|
5/12/2018 |
4 MB |
|
IGD-TP Exchange Forum 8 – Poster 7 – Vaclava Havlova – Canister Material Corrosion Test Under In Situ Conditions (MACOTE Experiment)
|
7/12/2018 |
1 MB |
|
IGD-TP Exchange Forum 8 – Poster 8 – Holger Tietze-Jaensch – The CHANCE project “Characterization of conditioned nuclear waste for its safe disposal in Europe”
|
5/12/2018 |
1 MB |
|
IGD-TP Exchange Forum 8 – Poster 9 – Christian Herold – Project “KoBrA” – Study on Requirements and Concepts for SF/HLW Final Disposal Canisters in Salt, Clay and Crystalline Rock
|
5/12/2018 |
275 KB |
|
IGD-TP Exchange Forum 8 – Poster Abstracts
|
29/11/2018 |
288 KB |
|
IGD-TP Exchange Forum 8 – Second Announcement
|
12/09/2018 |
149 KB |
|
IGD-TP Exchange Forum 8 – Third Announcement
|
29/10/2018 |
176 KB |
|
IGD-TP Flyer 2014
|
6/10/2014 |
349 KB |
|
IGD-TP Newsletter 1
|
13/09/2013 |
1 MB |
|
IGD-TP Newsletter 10
|
7/10/2020 |
3 MB |
|
IGD-TP Newsletter 11
|
30/10/2021 |
4 MB |
|
IGD-TP Newsletter 12
|
3/09/2022 |
2 MB |
|
IGD-TP Newsletter 2
|
1/07/2014 |
1,017 KB |
|
IGD-TP Newsletter 3
|
2/03/2015 |
2 MB |
|
IGD-TP Newsletter 4
|
1/12/2015 |
1,017 KB |
|
IGD-TP Newsletter 5
|
4/07/2016 |
1 MB |
|
IGD-TP Newsletter 6
|
12/07/2017 |
636 KB |
|
IGD-TP Newsletter 7
|
12/07/2018 |
2 MB |
|
IGD-TP Newsletter 8
|
30/07/2019 |
3 MB |
|
IGD-TP Newsletter 9 – 10 year Anniversary Special Edition
|
19/11/2019 |
5 MB |
|
IGD-TP Position Paper 2018-01: The Need for Sustained Collaborative Research, Development and Demonstration
|
7/09/2018 |
499 KB |
|
IGD-TP Position Paper 2019-01: Position for the First EURAD General Assembly
|
14/10/2019 |
184 KB |
|
IGD-TP Position Paper 2019-02: Position on Knowledge Management in EURAD
|
14/10/2019 |
60 KB |
|
IGD-TP Position Paper 2020-01: Feedback on EURAD so far
|
6/03/2020 |
242 KB |
|
IGD-TP Position Paper 2021-01: WMO Response to EURAD SRA Plan
|
24/05/2021 |
338 KB |
|
IGD-TP published a position paper on EURAD SRA update
|
18/10/2022 |
370 KB |
|
IGD-TP Secretariat SECIGD2 Project
|
24/04/2018 |
1,022 KB |
|
IGD-TP Symposium and Webinar 2022 – First Announcement
|
26/04/2021 |
312 KB |
|
IGD-TP Symposium and Webinar 2022 – Second Announcement and Call for Posters
|
10/09/2021 |
909 KB |
|
IGD-TP Terms of Reference January 2018
|
9/01/2018 |
149 KB |
|
IGD-TP Terms of Reference June 2019
|
20/11/2019 |
96 KB |
|
IGD-TP Vision 2040 and Strategic Research Agenda
|
7/10/2020 |
1 MB |
|
IGD-TP_2011_Public consultation comments and responses on draft SRA document version December 23, 2010
|
8/08/2012 |
454 KB |
|
IGD-TP_2011_Strategic Research Agenda
|
8/08/2012 |
3 MB |
|
IGD-TP_Vision Document
|
2/08/2016 |
10 MB |
|
IGD-TP/SNETP factsheet
|
27/04/2015 |
167 KB |
|
Introductory Course on EURAD and Radioactive Waste Management – Preliminary Agenda
|
24/06/2020 |
450 KB |
|
JOPRAD 2016 Dissemination Strategy (Deliverable D6.1)
|
20/05/2016 |
1 MB |
|
JOPRAD 2016 Mid Term Workshop Report v1.2
|
20/11/2016 |
275 KB |
|
JOPRAD 2016 Newsletter #1
|
20/02/2016 |
404 KB |
|
JOPRAD 2016 Newsletter #2
|
20/12/2016 |
390 KB |
|
JOPRAD 2016 WP2 Synthesis (Deliverable D2.7)
|
31/05/2018 |
880 KB |
|
JOPRAD 2017 Conditions for Implementing a Joint Programme (Deliverable D3.2)
|
31/05/2018 |
291 KB |
|
JOPRAD 2017 Draft Programme Document for consultation (WP4, D4.2, v0.7, March 2017)
|
20/03/2017 |
3 MB |
|
JOPRAD 2017 Final Workshop Report (Deliverable D1.8)
|
31/05/2018 |
525 KB |
|
JOPRAD 2017 Final Workshop, presentation 2 (key note) by D. Metlay (NWTRB – USA) on “Collaborative Social Science Research: The Other Side of the Coin”
|
14/12/2017 |
864 KB |
|
JOPRAD 2017 Final Workshop, presentation 3 by C. Davies (EC) on “European Joint Research Programme in the management and disposal of radioactive waste”
|
14/12/2017 |
569 KB |
|
JOPRAD 2017 Final Workshop, presentation 4 by J. Delay (Andra) on “JOPRAD: rationale, objectives and overview of outcomes”
|
14/12/2017 |
674 KB |
|
JOPRAD 2017 Final Workshop, presentation 5 by J. Miksova (CV REZ) and F. Lemy (Bel V) on “Joint Programme Actors and Boundary Conditions”
|
14/12/2017 |
465 KB |
|
JOPRAD 2017 Final Workshop, presentation 6a by R. Kowe (RWM) and G. Buckau (JRC) on “Joint Programme Vision, Strategic Research Agenda and Knowledge Management Programme”
|
14/12/2017 |
1 MB |
|
JOPRAD 2017 Final Workshop, presentation 6b by R. Kowe (RWM) and G. Buckau (JRC) on “Joint Programme Vision, Strategic Research Agenda and Knowledge Management Programme”
|
14/12/2017 |
509 KB |
|
JOPRAD 2017 Final Workshop, presentation 7 by M. Garcia (Andra) on “JOPRAD outcomes: Governance and implementation strategy of the EJP”
|
14/12/2017 |
630 KB |
|
JOPRAD 2017 Final Workshop, presentation 8 by A. Banford (NUGENIA) on “NUGENIA: view of waste producers and contribution to Joint Programme on RWMD”
|
14/12/2017 |
1 MB |
|
JOPRAD 2017 Final Workshop, presentation 9 by M. Garcia and S. Schumacher (Andra) on “Preparation of activities to be included in EJP1”
|
14/12/2017 |
973 KB |
|
JOPRAD 2017 Programme Document (Deliverable D4.4)
|
31/05/2018 |
1 MB |
|
JOPRAD 2017 Stakeholder Involvement (Deliverable D3.7)
|
31/05/2018 |
878 KB |
|
JOPRAD 2018 Overall Scheme for a Joint Programme (Deliverable D5.4)
|
31/05/2018 |
689 KB |
|
JOPRAD Deliverable D1.4 – Mid-Term Workshop report
|
11/09/2019 |
275 KB |
|
JOPRAD Deliverable D4.1 – Terms of Reference for Programme document
|
11/09/2019 |
82 KB |
|
JOPRAD Deliverable D4.3 – JOPRAD Programme Document Workshop report
|
11/09/2019 |
312 KB |
|
JOPRAD Deliverable D5.1 – Roadmap for a Joint Programme on Radioactive Waste Management and Disposal
|
11/09/2019 |
422 KB |
|
JOPRAD Deliverable D5.2 – Governance and implementation mechanisms of the EJP
|
11/09/2019 |
1,013 KB |
|
JRC Training Course on SNF Experiments – Event Flyer
|
10/02/2020 |
309 KB |
|
LUCOEX D1:01 Project Plan
|
15/08/2018 |
118 KB |
|
LUCOEX D1:02 Risk Assessment
|
25/09/2018 |
118 KB |
|
LUCOEX D1:03 Training programme
|
15/08/2018 |
970 KB |
|
LUCOEX D1:04 Programme on staff secondment
|
15/08/2018 |
946 KB |
|
LUCOEX D1:05 Communication Action Plan
|
15/08/2018 |
943 KB |
|
LUCOEX D1:06 Minutes from PPM No. 1
|
15/08/2018 |
11 MB |
|
LUCOEX D1:07 Expert Group Report No. 1
|
15/08/2018 |
1 MB |
|
LUCOEX D1:08 Minutes from PPM No. 2
|
15/08/2018 |
15 MB |
|
LUCOEX D1:09 Compilation of presentations from mid-term workshop
|
15/08/2018 |
48 MB |
|
LUCOEX D1:11 Expert Group Report No. 2
|
15/08/2018 |
914 KB |
|
LUCOEX D1:13 Proceedings from the large workshop
|
15/08/2018 |
17 MB |
|
LUCOEX D1:13 Proceedings from the large workshop incl. presentations
|
15/08/2018 |
67 MB |
|
LUCOEX D1:13 Scientific Rapporteurs report from the large workshop
|
15/08/2018 |
360 KB |
|
LUCOEX D1:15 Result of LUCOEX with possible use in other EU Member States’ concepts
|
15/08/2018 |
2 MB |
|
LUCOEX D1:16 Publishable technical paper/article on WP2 result
|
15/08/2018 |
705 KB |
|
LUCOEX D1:16b Publishable technical paper/article on WP2 result
|
15/08/2018 |
155 KB |
|
LUCOEX D1:17 Publishable technical paper/article on WP3 result
|
26/09/2018 |
516 KB |
|
LUCOEX D1:18 Article – State-of-art, proof-of-concept installations for repository concepts based in crystalline rock
|
26/09/2018 |
708 KB |
|
LUCOEX D1:19 Publishable technical paper/article on WP5 result
|
26/09/2018 |
5 MB |
|
LUCOEX D1:20 Minutes and presentations from PPM No. 5
|
26/09/2018 |
41 MB |
|
LUCOEX D1:21 Final report WP1
|
26/09/2018 |
546 KB |
|
LUCOEX D1:22 Final project technical report
|
26/09/2018 |
7 MB |
|
LUCOEX D2:01 Workplan
|
26/09/2018 |
3 MB |
|
LUCOEX D2:02 Report on construction of the emplacement tunnel
|
26/09/2018 |
18 MB |
|
LUCOEX D2:03 Requirements, manufacturing and QC of the buffer components
|
26/09/2018 |
77 MB |
|
LUCOEX D2:04 Construction of emplacement equipment
|
26/09/2018 |
24 MB |
|
LUCOEX D2:05 Emplacement report
|
26/09/2018 |
13 MB |
|
LUCOEX D2:06 Final report WP2
|
15/08/2018 |
9 MB |
|
LUCOEX D3:01 Report on the preliminary test of forced casing digging
|
26/09/2018 |
2 MB |
|
LUCOEX D3:02 Test plan of the ALC experiment
|
26/09/2018 |
9 MB |
|
LUCOEX D3:03 Report of the digging and emplacement of the cell
|
26/09/2018 |
2 MB |
|
LUCOEX D3:04 Final report WP3
|
26/09/2018 |
2 MB |
|
LUCOEX D4:01 Working report of manufacturing of distance blocks and blocks for the supercontainer
|
26/09/2018 |
2 MB |
|
LUCOEX D4:02 Working report on the upgrades done to the deposit machine
|
26/09/2018 |
2 MB |
|
LUCOEX D4:03 KBS-3H Preparations, assembly and installation of the Multi Purpose Test
|
26/09/2018 |
21 MB |
|
LUCOEX D4:04 Final report WP 4
|
26/09/2018 |
940 KB |
|
LUCOEX D4:05 Steered core drilling of boreholes K03009F01 and K08028F01 at the Äspö HRL
|
26/09/2018 |
17 MB |
|
LUCOEX D4:06 Initial data report for the Multi Purpose Test
|
26/09/2018 |
19 MB |
|
LUCOEX D4:07 Comparison between uni-axial and isostatic compaction method for the production of bentonite components
|
26/09/2018 |
1 MB |
|
LUCOEX D5:01 Detailed project plan
|
26/09/2018 |
395 KB |
|
LUCOEX D5:02 Buffer emplacement test
|
26/09/2018 |
3 MB |
|
LUCOEX D5:03 Memo on designing the gap filling tool
|
26/09/2018 |
1 MB |
|
LUCOEX D5:04 Memo on buffer emplacement testing
|
26/09/2018 |
2 MB |
|
LUCOEX D5:05 Quality Assurance and Problem Handling during buffer emplacement
|
26/09/2018 |
1 MB |
|
LUCOEX D5:06 Definition of the WP5 emplacement process phases and their quality requirements
|
26/09/2018 |
294 KB |
|
LUCOEX D5:07 Memo on the development of quality assurance tools
|
26/09/2018 |
2 MB |
|
LUCOEX D5:08 Plans for solving the emplacement problem situations
|
26/09/2018 |
5 MB |
|
LUCOEX D5:09 Final report WP5
|
26/09/2018 |
3 MB |
|
LUCOEX D5:10 Plan on WP5 integration and dissemination
|
26/09/2018 |
1 MB |
|
LUCOEX D5:11 Project expert review report
|
26/09/2018 |
606 KB |
|
LUCOEX D5:12 Interim report on project reviews
|
26/09/2018 |
201 KB |
|
LUCOEX D5:13 Interim report on the project reviews
|
26/09/2018 |
180 KB |
|
LUCOEX D5:14 Interim report on the project reviews
|
26/09/2018 |
1 MB |
|
LUCOEX D5:15 WP5 newsletter Posiva
|
26/09/2018 |
191 KB |
|
LUCOEX D5:16 WP5 newsletter Posiva
|
26/09/2018 |
71 KB |
|
LUCOEX D5:17 WP5 newsletter Posiva
|
26/09/2018 |
188 KB |
|
LUCOEX D5:18 WP5 paper for professional journal
|
26/09/2018 |
3 MB |
|
LUCOEX D5:19 WP5 paper for professional journal
|
26/09/2018 |
409 KB |
|
LUCOEX D6:01 Project presentation document
|
15/08/2018 |
2 MB |
|
LUCOEX D6:02 Website portal
|
26/09/2018 |
3 MB |
|
LUCOEX D6:03 WP6 newsletter
|
26/09/2018 |
1 MB |
|
LUCOEX D6:04 WP6 Summary of progress of work
|
26/09/2018 |
216 KB |
|
LUCOEX D6:05 WP6 newsletter
|
26/09/2018 |
806 KB |
|
LUCOEX D6:06 WP6 newsletter
|
15/08/2018 |
1 MB |
|
LUCOEX D6:09 WP6 newsletter
|
26/09/2018 |
723 KB |
|
LUCOEX D6:10 Final project report
|
26/09/2018 |
3 MB |
|
LUCOEX Implementation of the full-scale emplacement (FE) experiment at the Mont Terri rock laboratory
|
26/09/2018 |
6 MB |
|
LUCOEX Orientation Uncertainty of Structures Measured in Cored Boreholed: Methodology and Case Study of Swedish Crystalline Rock
|
26/09/2018 |
1 MB |
|
Master Deployment Plan 2014
|
23/12/2014 |
5 MB |
|
MICADO: Final project report
|
20/09/2018 |
805 KB |
|
MICADO: GRS 2008 annual report
|
20/09/2018 |
511 KB |
|
MICADO: Spent Fuel Waste Disposal: Analyses of Model Uncertainty in the MICADO Project
|
20/09/2018 |
308 KB |
|
MIND 2015 D1.1 A Review of Anthropogenic Organic Wastes and Their Degradation Behaviour
|
20/12/2015 |
3 MB |
|
MIND 2016 D2.1 Inventory of reducing gases
|
20/11/2016 |
841 KB |
|
MIND 2016 D3.1 Year 1 Evaluation Report
|
20/10/2016 |
3 MB |
|
MIND 2016 D3.3 Modular microbiology education and training
|
20/11/2016 |
2 MB |
|
MIND 2016 Newsletter #1
|
20/03/2016 |
895 KB |
|
MIND 2016 Newsletter #2
|
20/10/2016 |
1 MB |
|
MIND 2017 D2.3 Interim report on deep gases and sulphur compounds as biogeochemical energy sources in crystalline rock
|
20/08/2017 |
840 KB |
|
MIND 2017 D3.4 Year 2 Synthesis Report
|
20/07/2017 |
1 MB |
|
MIND 2017 Newsletter #3
|
20/03/2017 |
3 MB |
|
MIND 2017 Newsletter #4
|
20/10/2017 |
2 MB |
|
MIND 2018 Newsletter #5
|
7/05/2018 |
2 MB |
|
MIND 2018 Newsletter #6
|
29/10/2018 |
2 MB |
|
MIND 2019 D2.4 Bacterial presence and activity in compacted bentonites
|
2/05/2019 |
4 MB |
|
MIND Deliverable D1.5 – Microscopy and element mapping characterization studies of radionuclide
|
30/07/2019 |
3 MB |
|
MIND Deliverable D2.1 – Inventory of reducing gases
|
30/07/2019 |
841 KB |
|
MIND Deliverable D2.10 – Microbial mobility in saturated bentonites of different density
|
30/07/2019 |
2 MB |
|
MIND Deliverable D2.12 – Microbial activity in a concrete-bentonite clay inteface
|
30/07/2019 |
773 KB |
|
MIND Deliverable D2.16 – Microbial activity and the physical, chemical and transport properties of bentonite buffer
|
30/07/2019 |
5 MB |
|
MIND Deliverable D2.2 – Design, set up and operation of experimental equipment
|
30/07/2019 |
656 KB |
|
MIND Deliverable D2.3 – Interim report on deep gases and sulphur compounds.
|
30/07/2019 |
840 KB |
|
MIND Deliverable D2.6 – Microbial diversity in bentonite buffer of aged bentonite buffer experiment
|
30/07/2019 |
782 KB |
|
MIND Deliverable D2.7 – Microbial diversity in aged bentonites
|
30/07/2019 |
2 MB |
|
MIND Deliverable D2.8 – Long-term stability of bentonite in the presence of microorganisms
|
30/07/2019 |
7 MB |
|
MIND Deliverable D2.9 – Evolution of stress in biotic and abiotic clay flow cells
|
30/07/2019 |
7 MB |
|
MIND Deliverable D3.2-1
|
30/07/2019 |
544 KB |
|
MIND Deliverable D3.3 – Modular microbiology education and training
|
30/07/2019 |
2 MB |
|
MIND Deliverable D3.4 – Year two synthesis report
|
30/07/2019 |
1 MB |
|
MIND Deliverable D4.1 – Project homepage
|
30/07/2019 |
502 KB |
|
MIND Deliverable D4.2 – Project Presentation (PP) Compilation
|
30/07/2019 |
637 KB |
|
MIND Deliverable D4.3 – Dissemination and Exploitation Plan (DEP)
|
30/07/2019 |
554 KB |
|
MIND Deliverable D4.4 – Data Management Plan (DMP)
|
30/07/2019 |
466 KB |
|
MIND Deliverable D4.5 – Publication Plan
|
30/07/2019 |
445 KB |
|
MIND Project Annual Meeting 2019 – Flyer2
|
27/11/2018 |
612 KB |
|
MIND Project Annual Meeting 4 (May 2019) – Short Abstracts
|
31/07/2019 |
5 MB |
|
MoDeRn: A Socio-Technical Perspective on Repsitory Monitoring
|
20/09/2018 |
51 KB |
|
MoDeRn: D.1.2.1 Monitoring Reference Framework Report
|
20/09/2018 |
5 MB |
|
MoDeRn: D.1.3.1 Monitoring the Safe Disposal of Radioactive Waste: a Combined Technical and Socio-Political Activity
|
20/09/2018 |
1 MB |
|
MoDeRn: D.1.4.1 Exploratory Engagement Activity in Three European Countries
|
20/09/2018 |
4 MB |
|
MoDeRn: D.2.1.1 Technical requirements report
|
20/09/2018 |
656 KB |
|
MoDeRn: D.2.2.1 Workshop on Monitoring Technologies
|
20/09/2018 |
2 MB |
|
MoDeRn: D.2.2.2 State of art report on monitoring technology
|
20/09/2018 |
5 MB |
|
MoDeRn: D.3.1.1 Site plans and monitoring programmes report
|
20/09/2018 |
2 MB |
|
MoDeRn: D.3.2.1 Seismic tomography at Grimsel Test Site
|
20/09/2018 |
3 MB |
|
MoDeRn: D.3.3.1 Wireless sensor network demonstrator report
|
20/09/2018 |
6 MB |
|
MoDeRn: D.3.4.1 HADES Demonstrator Report
|
20/09/2018 |
2 MB |
|
MoDeRn: D.3.4.2 Wireless Data Transmission Demonstrator: from the HADES to the surface
|
20/09/2018 |
4 MB |
|
MoDeRn: D.3.5.1 Disposal cell monitoring system installation and testing demonstrator in Buree Underground Research Laboratory
|
20/09/2018 |
4 MB |
|
MoDeRn: D.4.1. Case Studies: Final Report
|
20/09/2018 |
5 MB |
|
MoDeRn: D.5.3.1 Expert Stakeholders Workshop report
|
20/09/2018 |
1 MB |
|
MoDeRn: D.5.4 Workshop proceedings
|
20/09/2018 |
18 MB |
|
MoDeRn: D.6.1 Monitoring during the Staged Implementation of Geological Disposal: the MoDeRn project synthesis
|
20/09/2018 |
3 MB |
|
MoDeRn: Different views on monitoring and the governance of repository development and staged closure
|
20/09/2018 |
97 KB |
|
MoDeRn: France’s State of the Art Distributed Optical Fibre Sensors Qualified for the Monitoring of the French Underground Repository for High Level and Intermediate Level Long Lived Radioactive Waste
|
20/09/2018 |
15 MB |
|
MoDeRn: National Monitoring Contexts Country Annexes
|
20/09/2018 |
5 MB |
|
MoDeRn: National Monitoring Contexts Summary Report
|
20/09/2018 |
740 KB |
|
MoDeRn: Project Presentation
|
20/09/2018 |
589 KB |
|
MoDeRn: Technology Summary Report
|
20/09/2018 |
4 MB |
|
Modern2020 2017 D2.1 Repository Monitoring Strategies and Screening Methodologies
|
20/02/2017 |
3 MB |
|
Modern2020 2nd International Conference on Monitoring in Geological Disposal of Radioactive Waste – First Announcement
|
24/07/2018 |
629 KB |
|
Modern2020 2nd International Conference on Monitoring in Geological Disposal of Radioactive Waste – Preliminary Programme
|
11/01/2019 |
190 KB |
|
Modern2020 Deliverable 2.3 – Responding to Monitoring Results
|
19/08/2019 |
1 MB |
|
Modern2020 Deliverable D2.2 – Monitoring Parameter Screening: Test Cases
|
15/01/2020 |
8 MB |
|
Modern2020 Deliverable D3.1 – Synthesis report on relevant monitoring technologies for repository
|
25/10/2019 |
6 MB |
|
Modern2020 Deliverable D3.2 – Wireless data transmission systems for repository monitoring
|
19/08/2019 |
6 MB |
|
Modern2020 Deliverable D3.3 – Long-term power supply sources for repository monitoring
|
19/08/2019 |
4 MB |
|
Modern2020 Deliverable D3.3 – Long-term power supply sources for repository monitoring
|
4/10/2019 |
4 MB |
|
Modern2020 Deliverable D3.4 – New sensors for repository monitoring
|
25/10/2019 |
7 MB |
|
Modern2020 Deliverable D3.5 – Geophysical Methods for Repository Monitoring
|
25/10/2019 |
6 MB |
|
Modern2020 Deliverable D3.6 – Reliability and qualification of components
|
25/10/2019 |
9 MB |
|
Modern2020 Deliverable D4.1 – EBS monitoring plan – Spent fuel disposal concept at crystalline host rock
|
19/08/2019 |
5 MB |
|
Modern2020 Deliverable D4.2 – Development of HA monitoring plan
|
25/10/2019 |
7 MB |
|
Modern2020 Deliverable D4.3 – Long Term Rock Buffer Monitoring (As-built )
|
25/10/2019 |
10 MB |
|
Modern2020 Deliverable D4.4 – FE and TEM results
|
25/10/2019 |
6 MB |
|
Modern2020 Deliverable D4.5 – Synthesis on Monitoring Demonstrators and Additional Cases
|
31/10/2019 |
3 MB |
|
Modern2020 Deliverable D5.1 – Monitoring the Underground
|
25/07/2019 |
796 KB |
|
Modern2020 Deliverable D5.2 – Stakeholder Guide
|
25/07/2019 |
2 MB |
|
Modern2020 Deliverable D5.3 – Repository Monitoring in the Context of Repository Governance
|
25/10/2019 |
850 KB |
|
Modern2020 Deliverable D6.1 – Plan for the dissemination and exploitation of the project’s results
|
25/10/2019 |
576 KB |
|
Modern2020 Deliverable D6.2 – Modern2020 public website
|
25/10/2019 |
246 KB |
|
Modern2020 Deliverable D6.3 – Modern2020 Final Conference Proceedings
|
25/10/2019 |
9 MB |
|
Modern2020 Deliverable D6.4 – Report on the Modern2020 Training School
|
15/01/2020 |
3 MB |
|
Modern2020 Deliverable D6.5 – Modern2020 Project Synthesis – Repository Monitoring: Strategies, Technologies and Implementation
|
31/10/2019 |
4 MB |
|
Modern2020 Training School Flyer
|
11/01/2019 |
5 MB |
|
NEA DGR Report: Management and Disposal of High-Level Radioactive Waste: Global Progress and Solutions
|
13/07/2020 |
7 MB |
|
NEA Policy Brief: Final Disposal of Radioactive Waste
|
13/07/2020 |
147 KB |
|
NEA RWMC Workshop on Developing Safety Cases for Various Radioactive Waste Disposal Facilities – Draft Agenda
|
29/06/2020 |
724 KB |
|
NEA RWMC Workshop on Developing Safety Cases for Various Radioactive Waste Disposal Facilities – Draft Concept Paper
|
29/06/2020 |
517 KB |
|
NF PRO 2008 Final Report
|
11/02/2022 |
883 KB |
|
OBRA – Final Report
|
28/01/2022 |
491 KB |
|
OBRA – First annual activity summary
|
28/01/2022 |
107 KB |
|
PAMINA Deliverable D1.1.1 – Task reports for the first group of topics
|
8/10/2019 |
9 MB |
|
PAMINA Deliverable D1.1.2 – Task reports for the second group of topics
|
8/10/2019 |
20 MB |
|
PAMINA Deliverable D1.1.3 – Task reports for the third group of topics
|
8/10/2019 |
9 MB |
|
PAMINA Deliverable D1.1.4 – European Handbook of the state-of-the-art of safety assessments of geological repositories – Part 1
|
8/10/2019 |
3 MB |
|
PAMINA Deliverable D2.1.A.1 – Report on the PAMINA Workshop on the Regulatory Role in Managing Uncertainties in the Safety Case for Geological Disposal of Radioactive Wastes
|
8/10/2019 |
355 KB |
|
PAMINA Deliverable D2.1.B.1 – Report on the PAMINA Stakeholder Workshop: Communicating Safety Issues for a Geological Repository
|
8/10/2019 |
8 MB |
|
PAMINA Deliverable D2.1.B.2 – Development and Testing of a Template to Present PA Results
|
8/10/2019 |
1 MB |
|
PAMINA Deliverable D2.1.B.3 – The Development and Use of Brochures to Communicate Safety Issues for a Geological Disposal Facility for Radioactive Waste
|
8/10/2019 |
726 KB |
|
PAMINA Deliverable D2.1.C.1 – The Advantages and Disadvantages of Different Approaches to the Quantification of Uncertainty in System Performance Assessment Calculations
|
8/10/2019 |
562 KB |
|
PAMINA Deliverable D2.1.D.1 – Evaluation of Approaches to Sensitivity Analysis
|
8/10/2019 |
13 MB |
|
PAMINA Deliverable D2.2.A.1 – Treatment of Parameter Uncertainty in PA
|
8/10/2019 |
1 MB |
|
PAMINA Deliverable D2.2.B.1 – Studies to Investigate the Relative Significance of Parameter and Model Uncertainty in Calculating the Radiological Risks via Groundwater from a Geological Disposal Facility
|
8/10/2019 |
923 KB |
|
PAMINA Deliverable D2.2.B.2 – Uncertainties Associated with Modelling the Consequences of Gas
|
11/10/2019 |
5 MB |
|
PAMINA Deliverable D2.2.B.3 – A Hydrogeochemical Change in an Engineered Barrier System – Two Model Responses to Uranium Transport
|
11/10/2019 |
959 KB |
|
PAMINA Deliverable D2.2.B.4 – Treatment of Model Uncertainty
|
11/10/2019 |
628 KB |
|
PAMINA Deliverable D2.2.C.1 – Scenario Uncertainty
|
11/10/2019 |
565 KB |
|
PAMINA Deliverable D2.2.D.1 – Evaluation and Testing of Approaches to Treat Spatial Variability in PA
|
11/10/2019 |
12 MB |
|
PAMINA Deliverable D2.2.E.1 – Fully Probabalistic Safety Assessment
|
11/10/2019 |
3 MB |
|
PAMINA Deliverable D2.3.1 – The Treatment of Uncertainty in Performance Assessment and Safety Case Development: Synthesis of PAMINA RTDC-2
|
11/10/2019 |
2 MB |
|
PAMINA Deliverable D3.1.1 – Report on Scenario Development
|
11/10/2019 |
2 MB |
|
PAMINA Deliverable D3.2.1 – PA Approach to Gas Migration
|
11/10/2019 |
5 MB |
|
PAMINA Deliverable D3.3.1 – Performance Assessment Approach in a Radionuclide Source Term Modelling
|
11/10/2019 |
552 KB |
|
PAMINA Deliverable D3.4.1 – General Concepts of Supporting the Safety Case by Means of Safety and Performance Indicators
|
11/10/2019 |
286 KB |
|
PAMINA Deliverable D3.4.2 – Safety Indicators and Performance Indicators
|
11/10/2019 |
1 MB |
|
PAMINA Deliverable D5.1 – Project Summary Report
|
11/10/2019 |
2 MB |
|
PAMINA Project Milestones
|
11/10/2019 |
57 MB |
|
PAMINA WP4 Deliverables
|
11/10/2019 |
31 MB |
|
PEBS 2.1-5 EB experiment Laboratory infiltration tests report
|
24/04/2018 |
1 MB |
|
PEBS 2.1-6 EDZ seismic results – seismic transmission measurements
|
24/04/2018 |
11 MB |
|
PEBS Baseline for Project Work
|
24/04/2018 |
2 MB |
|
PEBS D1.1 The Early Evolution of the EBS in Safety Assessments
|
24/04/2018 |
2 MB |
|
PEBS D1.2 Definition of cases/scenarios to be studied
|
24/04/2018 |
222 KB |
|
PEBS D2.1-1 Engineered Barrier Emplacement Experiment in Opalinus Clay: “EB” Experiment
|
24/04/2018 |
8 MB |
|
PEBS D2.1-4 AS-BUILT OF DISMANTLING OPERATION
|
24/04/2018 |
16 MB |
|
PEBS D2.1-7 EB experiment Laboratory post-mortem analyses report
|
24/04/2018 |
8 MB |
|
PEBS D2.1-8 EB dismantling Synthesis report
|
24/04/2018 |
5 MB |
|
PEBS D2.1-9
|
24/04/2018 |
952 KB |
|
PEBS D2.2-10 Seismic data report on EDZ and EBS evolution (HE-E)
|
24/04/2018 |
27 MB |
|
PEBS D2.2-11 Final Report on the HE-E Experiment
|
24/04/2018 |
15 MB |
|
PEBS D2.2-12 Laboratory studies on stress-strain behavior
|
24/04/2018 |
2 MB |
|
PEBS D2.2-3 Report of the construction of the HE-E experiment
|
24/04/2018 |
21 MB |
|
PEBS D2.2-5 Measurement of Thermal Parameters of the HE-E Buffer Materials
|
24/04/2018 |
2 MB |
|
PEBS D2.2-7.1 Long-term THM tests reports: THM cells for the HE-E test: setup and first results
|
24/04/2018 |
2 MB |
|
PEBS D2.2-7.2 Long-term THM tests reports: Isothermal infiltration tests with materials from the HE-E
|
24/04/2018 |
7 MB |
|
PEBS D2.2-7.3 Long-term THM tests reports: THM cells for the HE-E test: update of results until February 2014
|
24/04/2018 |
3 MB |
|
PEBS D2.2-8.1 HE-E annual monitoring report
|
24/04/2018 |
3 MB |
|
PEBS D2.2-8.3 HE-E annual monitoring report
|
24/04/2018 |
6 MB |
|
PEBS D2.2-9 Thermal Characterisation of HE-E Buffer
|
24/04/2018 |
661 KB |
|
PEBS D2.3-2.1 Report on GAME status, 1st period
|
24/04/2018 |
5 MB |
|
PEBS D2.3-2.2 Report on GAME status, 2nd period
|
24/04/2018 |
3 MB |
|
PEBS D2.3-3.1 Laboratory tests at the interfaces
|
24/04/2018 |
3 MB |
|
PEBS D2.3-3.2 Results of Small Cells with mortar-bentonite-magnetite
|
24/04/2018 |
4 MB |
|
PEBS D2.3-5 GAME data analysis report before dismantling
|
24/04/2018 |
3 MB |
|
PEBS D2.3-6.1 Geochemical interactions at the concrete-bentonite interface of column experiments
|
24/04/2018 |
5 MB |
|
PEBS D2.3-6.2 Formation of iron oxide and oxyhydroxides under different environmental conditions
|
24/04/2018 |
4 MB |
|
PEBS D3.1 Feasibility report on GAME mock-ups
|
24/04/2018 |
5 MB |
|
PEBS D3.1-1 Modelling and interpretation of the EB experiment hydration
|
24/04/2018 |
4 MB |
|
PEBS D3.1-2 Interpretation of the final state of the EB experiment barrier
|
24/04/2018 |
4 MB |
|
PEBS D3.2-1 Design and predictive modelling of the HE-E test
|
24/04/2018 |
20 MB |
|
PEBS D3.2-2 Modelling and Interpretation of the HE-E Experiment of the PEBS Project
|
24/04/2018 |
15 MB |
|
PEBS D3.3-1 Inverse Modelling of the FEBEX in situ test using iTOUGH2
|
24/04/2018 |
5 MB |
|
PEBS D3.3-2 Report on the modeling with initially available data
|
24/04/2018 |
888 KB |
|
PEBS D3.3-3 Modelling and interpretation of the FEBEX mock up test and of the long-term THM tests
|
24/04/2018 |
22 MB |
|
PEBS D3.4-1 Report on testing multiple-continua THC(m) models with laboratory and large-scale tests
|
24/04/2018 |
3 MB |
|
PEBS D3.5-1 Report on integration of available data for bentonites from different scales and scaling laws and extrapolation for long-term analyses for clay barriers
|
24/04/2018 |
11 MB |
|
PEBS D3.5-2 Formulation of a model suitable for long term predictions
|
24/04/2018 |
512 KB |
|
PEBS D3.5-3 Report on long-term THC(m) predictions of a HLW repository in granite
|
24/04/2018 |
12 MB |
|
PEBS D3.5-4 Extrapolation of the models developed to the repository long- term evolution and evaluation of uncertainties
|
24/04/2018 |
19 MB |
|
PEBS D3.5-4a Extrapolation of the models developed to the repository longterm evolution and evaluation of uncertainties – Review of thermomechanical continuum mixture theories applicable for EBS materials
|
24/04/2018 |
642 KB |
|
PEBS D4.1 Integration of the Short-term Evolution of the Engineered Barrier System (EBS) with the Long-term Safety Perspective
|
24/04/2018 |
4 MB |
|
PEBS D5.1 Project Presentation
|
24/04/2018 |
360 KB |
|
PEBS D5.13 Documents of 3rd Workshop
|
24/04/2018 |
4 MB |
|
PEBS D5.15 Documents of 4th Workshop
|
24/04/2018 |
7 MB |
|
PEBS D5.16 Final Scientific Report
|
24/04/2018 |
3 MB |
|
PEBS D5.5 Documents of 1st Workshop
|
24/04/2018 |
21 MB |
|
PEBS D6.1 1st Periodic Report
|
24/04/2018 |
131 KB |
|
PEBS D6.2 2nd Periodic Report
|
24/04/2018 |
375 KB |
|
PEBS Newsletter 1
|
24/04/2018 |
1 MB |
|
PEBS Newsletter 2
|
24/04/2018 |
878 KB |
|
PEBS Newsletter 3
|
24/04/2018 |
446 KB |
|
PEBS Newsletter 4
|
24/04/2018 |
222 KB |
|
PEBS Newsletter 5
|
24/04/2018 |
208 KB |
|
PEBS Newsletter 6
|
24/04/2018 |
675 KB |
|
PEBS Newsletter 7
|
24/04/2018 |
2 MB |
|
PEBS Newsletter 8
|
24/04/2018 |
403 KB |
|
PLATENSO Deliverable D4.2 – Scenario 2: “Phasing out nuclear power”
|
16/10/2019 |
1 MB |
|
PLATENSO Newsletter #1
|
17/07/2020 |
2 MB |
|
PLATENSO Newsletter #4
|
17/07/2020 |
2 MB |
|
Prague congress centre – Access Map
|
22/10/2013 |
651 KB |
|
PREDIS – D1.5: Proceedings of PREDIS May Workshop 2021
|
16/06/2022 |
5 MB |
|
PREDIS – D2.2: Gap Analysis
|
16/06/2022 |
3 MB |
|
PREDIS – D2.4: International approaches to establishing a waste acceptance system
|
16/06/2022 |
2 MB |
|
PREDIS – D3.4: Design and Definition of PREDIS training program (WP3)
|
16/06/2022 |
2 MB |
|
PREDIS – D3.6: Priority list and mobility formats
|
16/06/2022 |
1 MB |
|
PREDIS – D7.1: State of the Art in packaging, storage, and monitoring of cemented wastes
|
16/06/2022 |
2 MB |
|
PREDIS – D7.2.2: Reference package and factors affecting package evolution and degradation
|
16/06/2022 |
1 MB |
|
PREDIS – M2.3: Baseline Strategic Research Agenda
|
16/06/2022 |
1 MB |
|
PREDIS – MS1: End user seminars
|
16/06/2022 |
724 KB |
|
PREDIS – MS14: LCA and LCC protocol guidance
|
16/06/2022 |
1 MB |
|
Radiation Leakage and the Precision of Characterizing Nuclear Material Using Calorimetric Assay
|
2/08/2019 |
460 KB |
|
RED-IMPACT – Synthesis Report
|
9/02/2022 |
5 MB |
|
REDUPP Final Report
|
24/04/2018 |
594 KB |
|
REDUPP Newsletter 1
|
24/04/2018 |
280 KB |
|
REDUPP Newsletter 4
|
24/04/2018 |
294 KB |
|
RWM Science and Technology Plan 2020
|
11/11/2020 |
13 MB |
|
Safe and sustainable back-end of the fuel cycle (SSFC 2020) conference flyer
|
11/11/2019 |
287 KB |
|
SECIGD D1.7 Strategic Research Agenda Main Achievements and Way forward
|
24/04/2018 |
342 KB |
|
SECIGD2 D1-5-2 Master Deployment Plan and Joint Activities Outlines 2015
|
2/10/2015 |
4 MB |
|
SECIGD2 D1.1 Updated Website
|
24/04/2018 |
623 KB |
|
SECIGD2 D1.3 Terms of Reference
|
24/04/2018 |
473 KB |
|
SECIGD2 D1.4 4th IGD-TP Exchange Forum
|
24/04/2018 |
6 MB |
|
SECIGD2 D1.5 Master Deployment Plan and Joint Activities Outlines 2013
|
24/04/2018 |
4 MB |
|
SECIGD2 D1.5.1 Master Deployment Plan and Joint Activities Outlines 2014
|
24/04/2018 |
5 MB |
|
SECIGD2 D2.3 RD&D Planning Towards Geological Disposal of Radioactive Waste – Guidance for less-advanced Programmes
|
24/04/2018 |
1 MB |
|
SECIGD2 Project Final Report
|
24/04/2018 |
386 KB |
|
SITEX 2013 D1.1 Project Presentation
|
20/02/2019 |
266 KB |
|
SITEX 2013 D1.2 Communication Plan
|
20/02/2019 |
333 KB |
|
SITEX 2013 D2.2 Main key technical issues, expertise and support needed
|
20/02/2019 |
2 MB |
|
SITEX 2013 D5.1 Recent approaches for stakeholder involvement
|
20/02/2019 |
491 KB |
|
SITEX 2014 D2.1 Overview of Existing Technical Guides and Further Development
|
20/02/2019 |
2 MB |
|
SITEX 2014 D3.1 R&D Orientations for Technical Safety Organizations
|
20/02/2019 |
1,022 KB |
|
SITEX 2014 D3.2 Availability and needs for technical and scientific tools for TSOs
|
20/02/2019 |
691 KB |
|
SITEX 2014 D3.3 Strategy for implementing TSO`s R&D programmes
|
20/02/2019 |
486 KB |
|
SITEX 2014 D4.1 Available technical review guidance and further needs
|
20/02/2019 |
2 MB |
|
SITEX 2014 D4.2 A plan for competence development in expertise of radwaste disposal safety
|
20/02/2019 |
351 KB |
|
SITEX 2014 D5.2 Interaction with stakeholders in the technical review in practice
|
20/02/2019 |
5 MB |
|
SITEX 2014 D6.1 Conditions for establishing a sustainable expertise network
|
20/02/2019 |
2 MB |
|
SITEX 2014 D6.2 Terms of Reference (TOR) of the SITEX network
|
20/02/2019 |
2 MB |
|
SITEX-II Deliverable D1.1 – Strategic Research Agenda of the Expertise Function in the Field of Geological Disposal of Radioactive Waste
|
26/09/2019 |
3 MB |
|
SITEX-II Deliverable D1.2 – Setting the Terms of References for the SRA Implemenation
|
26/09/2019 |
320 KB |
|
SITEX-II Deliverable D2.1 – Developing a common understanding on the interpretation of safety requirements
|
29/09/2019 |
776 KB |
|
SITEX-II Deliverable D2.2 – Technical guide on the review of a safety case
|
29/09/2019 |
1 MB |
|
SITEX-II Deliverable D3.1 – Synthesis of existing practices for training and tutoring of experts in geological disposal safety
|
26/09/2019 |
3 MB |
|
SITEX-II Deliverable D3.2 – Development of a training module for generalist experts in geological disposal
|
29/09/2019 |
3 MB |
|
SITEX-II Deliverable D3.4 – Lessons learnt from the pilot training session
|
29/09/2019 |
6 MB |
|
SITEX-II Deliverable D4.1 – Conditions and means for developing interactions with Civil Society
|
29/09/2019 |
2 MB |
|
SITEX-II Deliverable D5.4 – Final Project Report
|
29/09/2019 |
2 MB |
|
SITEX-II Deliverable D5.5 – Action plan for establishing SITEX network
|
29/09/2019 |
1 MB |
|
SITEX-II Deliverable D6.1 – Presentation of the project
|
29/09/2019 |
565 KB |
|
SITEX-II Milestone M5.2 – Minutes from workshop with Civil Society, Budapest, June 2016
|
29/09/2019 |
2 MB |
|
SITEX-II Milestone M5.3 – Minutes from workshop with Civil Society, Brussels, November 2016
|
29/09/2019 |
2 MB |
|
SITEX-II Newsletter #1 – December 2016
|
29/09/2019 |
910 KB |
|
SITEX-II Newsletter #2- June 2017
|
29/09/2019 |
883 KB |
|
SITEX-II Newsletter #3 – November 2017
|
29/09/2019 |
939 KB |
|
SKB RD&D Programme 2019
|
28/01/2020 |
23 MB |
|
SKB School of Geological Disposal – April 2018 announcement
|
21/06/2018 |
1 MB |
|
SKB School of Geological Disposal – July 2019 information pack
|
15/07/2019 |
3 MB |
|
SKB School of Geological Disposal – June 2018 information pack
|
5/07/2018 |
3 MB |
|
Solution composition and particle size effects on the dissolution and 6 solubility of a ThO2 microstructural analogue for UO2 matrix of 7 nuclear fuel
|
24/04/2018 |
813 KB |
|
The Nuclear Materials Conference (NuMat2020) – Sponshorship and Exhibition Opportunities Flyer
|
26/11/2019 |
279 KB |
|
The Role of Optimisation in Geological Disposal Programmes for Radioactive Waste
|
3/04/2023 |
1 MB |
|
THERAMIN Conference 2020 Flyer
|
6/03/2019 |
640 KB |
|
THERAMIN D5.4 Project Synthesis Report
|
17/03/2021 |
2 MB |
|
THERAMIN D5.5 Project Summary Report
|
17/03/2021 |
580 KB |
|
THERAMIN Deliverable D3.1 – Matching of wastestreams to appropriate technology demonstrators
|
31/07/2019 |
157 KB |
|
THERAMIN Deliverable D3.3 – SHIVA and In-Can Melting technologies and demonstration test trials
|
31/07/2019 |
2 MB |
|
THERAMIN Deliverable D3.4 – Gasification based waste treatment
|
31/07/2019 |
1 MB |
|
THERAMIN Deliverable D3.5 – Test Report on Demonstration of Geomelt Technology for THERAMIN Project
|
31/07/2019 |
12 MB |
|
THERAMIN Deliverable D3.6 – Hot Isostatic Pressing (HIP) demonstration NNL/USFD
|
31/07/2019 |
2 MB |
|
THERAMIN Deliverable D3.7 – VICHR technology
|
31/07/2019 |
2 MB |
|
THERAMIN Deliverable D4.1 – Waste Acceptance Criteria and requirements in terms of characterisation
|
31/07/2019 |
631 KB |
|
THERAMIN Final Conference Booklet
|
17/03/2021 |
1 MB |
|
THERAMIN Milestone MS12 – Definition and adaptation of characterisation tests
|
31/07/2019 |
532 KB |
|
THERAMIN MS15 Project Poster
|
7/12/2018 |
1 MB |
|
THERAMIN MS23 Revised Project Poster
|
17/03/2021 |
1 MB |
|
THERAMIN Newsletter 1 (Jan 2018)
|
2/03/2018 |
2 MB |
|
THERAMIN Newsletter 2 (Feb 2019)
|
6/03/2019 |
6 MB |
|
THERAMIN Newsletter 3 (Nov 2019)
|
5/12/2019 |
2 MB |
|
THERAMIN Project Conference – Student Funding Application Form
|
12/12/2019 |
280 KB |
|
THERAMIN Project Conference Agenda
|
12/12/2019 |
93 KB |
|
THERAMIN Technical Training School Flyer
|
5/03/2019 |
1 MB |
|
THERAMMIN Deliverable D4.2 – Thermal treatment for radioactive waste minimisation and hazard reduction
|
3/10/2019 |
13 MB |
|
TIMODAZ D02 WP2 Scoping calculations from CIMNE
|
25/09/2018 |
775 KB |
|
TIMODAZ D02 WP2 Study of the thermo-hydro-mechanical behaviour of a clay repository
|
25/09/2018 |
2 MB |
|
TIMODAZ D03 WP2 Final report
|
25/09/2018 |
113 KB |
|
TIMODAZ D13 WP5.2 Final report – simulation of lab and in-situ tests
|
25/09/2018 |
5 MB |
|
TIMODAZ D13 WP5.2 Report Annex 1 – Hollow cylinder test in Boom Clay
|
25/09/2018 |
6 MB |
|
TIMODAZ D13 WP5.2 Report Annex 2 – Hollow cylinder tests on COX argillite
|
25/09/2018 |
4 MB |
|
TIMODAZ D13 WP5.2 Report Annex 3 – Hollow cylinder tests on Opalinus Clay
|
25/09/2018 |
10 MB |
|
TIMODAZ D13 WP5.2 Report Annex 4 – In situ heating test ATLAS in Mol
|
25/09/2018 |
5 MB |
|
TIMODAZ D13 WP5.2 Report Annex 5 – In situ dilatometer tests in Mont Terri
|
25/09/2018 |
4 MB |
|
TIMODAZ D13 WP5.2 Report Annex 6 – Large scale excavation and heater in-situ experiment: the PRACLAY experiment modelling
|
25/09/2018 |
11 MB |
|
TIMODAZ D14 WP6 Final report
|
25/09/2018 |
3 MB |
|
TIMODAZ D15 WP1 Executive summary of 1st period activities
|
25/09/2018 |
265 KB |
|
TIMODAZ D15 WP1 Executive summary of 3rd year activities
|
25/09/2018 |
1 MB |
|
TIMODAZ D15 WP1 Executive summary of mid-term activities
|
25/09/2018 |
844 KB |
|
TIMODAZ D15 WP1 Final activity report (submitted to EC)
|
25/09/2018 |
4 MB |
|
TIMODAZ D15 WP1 General project scope and objectives
|
20/09/2018 |
316 KB |
|
TIMODAZ photos
|
20/09/2018 |
1 MB |
|
Training Materials of the 1st GAS/HITEC Joint Training Course (EURAD D6.3)
|
17/06/2020 |
41 MB |
|
Two decades of Safety Case Development: An IGSC 20th anniversary brochure
|
12/01/2021 |
17 MB |
|